SOURCES SOUGHT
99 -- SLAC LSCC Parking Lots and Trailer Removal
- Notice Date
- 2/6/2020 10:32:17 AM
- Notice Type
- Sources Sought
- NAICS
- 23731
—
- Contracting Office
- SLAC Natl Accel Lab -DOE Contractor Menlo Park CA 94025 USA
- ZIP Code
- 94025
- Solicitation Number
- SLAC_ParkingLotTrailerDemoLSCC_Sources_Sought_02062020
- Response Due
- 2/13/2020 5:00:00 PM
- Archive Date
- 02/13/2020
- Point of Contact
- AJ Vandermeyden
- E-Mail Address
-
amiravan@slac.stanford.edu
(amiravan@slac.stanford.edu)
- Description
- THIS IS FOR SOURCES SOUGHT ONLY. Documents attached are draft versions only, and not for bidding.�Interested vendors should express their interest on the FBO posting SLAC Large Scale Collaboration Center (LSCC) Site Preparation: Parking Lots and Trailer Removal The SLAC National Accelerator Laboratory (SLAC) Is operated by Stanford University as a contractor for the United States Department of Energy (DOE) Office of Science. SLAC supports a large national and international community of scientific users performing cutting edge research in support of the DOE mission. Success of that mission is directly coupled to the general purpose infrastructure necessary to conduct this research. At SLAC the accomplishment of that mission is currently at risk given sub-standard buildings that do not provide the appropriate environment to conduct world class science or the supporting Management and Operations (M&O) functions. Need for additional parking lots and removal of existing trailers: This is a site improvement project in advance of the Large Scale Collaboration Center (LSCC)*� that includes site improvements and the demolition of trailers: T-270, 271, 451, 452, 453, and 294.� Base Scope of Work: Design-Build (D-8) and construct of parking lots as shown on attached LSCC Parking Lot Design drawing dated 02/03/2020. Work shall conform to this drawing, specifications, and applicable codes. Base scope will be the D-8 and construction of parking lots and infrastructure fit-up for future electrical vehicle charging stations (EVCS). Base scope will also include the demolition of trailers located in the east side of the 8137 parking lot. SLAC will review the parking lot and EVCS infrastructure cost to determine the most effective option(s) to undertake. The Work includes, but is not limited, to the following tasks: 1.�� �Provide underground utility service locator services to locate all underground piping and utilities before excavation. SLAC preferred subcontractor (Coast Wide Utility Locators - Sergio Yruel (831) 212-7999) shall be used for utility location. 2.�� �Validate that the attached scope of work within the LSCC Parking Lot Design drawing does not conflict with existing underground piping 3.�� �D-8 and construct parking lot per scope of work in the drawing LSCC Parking Lot Design which include: a.�� �Clearing and grubbing of parking lot area. b.�� �Excavate min 2"" to 4"" top soil such that all organic soil is removed, and scarifying sub grade to min 6"". c.�� �Grade the area to drain and compact the subgrade to 90% maximum density. Provide Mirafi 500 Geo Fabric or approved equal over the compacted subgrade, with minimum 2 feet lap. The perimeter of geo fabric shall be turned down a min of 12"" into the subgrade at edges of parking lot. d.�� �Provide and lay down 2 layers of Class II aggregate base; and compact each layer to 90% maximum density. The total compacted thickness of Class II aggregate base layers shall not be less than 8"" thick. Each compacted layer shall not exceed 6"" thickness. e.�� �Remove and properly dispose of the excavated soil (per SLAG Environment Safety & Health procedures). f.�� �Paint/stripe parking lot area as required per code, including parking stall, curbs, crosswalks, no parking zones, etc. Parking stalls shall be 9 feet by 18 feet each, with a 24 foot wide lane between stalls. g.�� �Provide and install SLAG standard ground cover landscape on the new parking lot medians as shown. h.�� �As an option, provide and install electrical vehicle charging station (EVCS) infrastructure. EVCS to be provided and installed by others. See drawings B0950- E05-004-00 and B0950-ES1-003-00 as reference drawings for the EVCS infrastructure. Infrastructure to be provided and installed shall include: i.�� �Concrete base for each of the charging station, with power conduit stubbed up above the concrete base. 1.�� �Conduit and wires for the EVCS to be fed from the new panel board through two Christy boxes. 2.�� �Coordinate with Facilities Operations to lock out and tag out (LOTO) system. Wires at the EVCS end to be left in a safe state and conduit capped and water tight. 3.�� �Two bollards to be installed for each EVCS. 4.�� �Conduits and wire to be run under the ground. ii.�� �Concrete base for distribution panel boards, which will include: 1. Panel Boards 2.�� �Unistrut for mounting the panel boards 3.�� �Four (4) bollards per panel 4.�� �Conduit and wires from existing transformer to the panel boards. The conduit and wire shall be terminated to the nearest transformer, as shown on the LSCC Parking Lot Design drawings (field verify). 5.�� �Conduits and wire to be run under the ground. iii. One sign for each EV parking stall that shall read: ""Not Reserved - Open to all Vehicles"". The EVCS stall will not need to be painted with ""Electrical Vehicle Parking"" notation and EV symbol, as show in the reference drawings. 4.�� �Demolition of six trailers per scope of work in the drawing LSCC Parking Lot Design which include: a.�� �Coordination with SLAG Facilities Operations, Field Construction Manager and Environmental Safety and Health (ES&H) to i.�� �Test and validate if the trailers are free from hazardous material (i.e. asbestos), see existing reports. 1.�� �Mitigate and properly dispose of all hazardous materials, per SLAG ES&H policy ii.�� �Coordinate to have SLAC Operations LOTO all energized utilities, put in a safe state, and demolish back to point that trailers can be safely removed. Utilities will include but is not limited to: 1.�� �Sanitary drain 2.�� �Domestic water 3.�� �Electrical 4.�� �Information technology (i.e. Ethernet copper or fiber optic cable) 5.�� �Security (i.e. copper or fiber optic cable) iii. Demolish six (6) trailers and associated support structure (i.e. foundations,�jacks, stairs, rails, etc.), and dispose of materials off site, per SLAC ES&H policy *The Large Scale Collaboration Center (LSCC)�is a new two to three -story approximately 34,000 to 45,000 gross square feet that is a separate� FBO posting at a later date.
- Web Link
-
SAM.gov Permalink
(https://beta.sam.gov/opp/2c44e36b739b4287a986098bf5adab0b/view)
- Place of Performance
- Address: Menlo Park, CA 94025, USA
- Zip Code: 94025
- Country: USA
- Zip Code: 94025
- Record
- SN05554134-F 20200208/200206230139 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |