Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF FEBRUARY 09, 2020 SAM #6646
SOLICITATION NOTICE

Z -- BOILER PLANT 7CC CONDENSATE SYSTEM REPAIRS

Notice Date
2/7/2020 1:38:50 PM
 
Notice Type
Solicitation
 
NAICS
238220 — Plumbing, Heating, and Air-Conditioning Contractors
 
Contracting Office
NAVAL FAC ENGINEERING CMD MID LANT NORFOLK VA 23511-0395 USA
 
ZIP Code
23511-0395
 
Solicitation Number
N4008520B3305
 
Response Due
2/14/2020 7:00:00 AM
 
Archive Date
02/29/2020
 
Point of Contact
Arturo Alvidrez, Phone: (401) 841-4442, Arturo Alvidrez, Phone: (915) 433-5638
 
E-Mail Address
arturo.alvidrez2@navy.mil, arturo.alvidrez2@navy.mil
(arturo.alvidrez2@navy.mil, arturo.alvidrez2@navy.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
Boiler Plan 7CC is the main steam generating plant for steam distribution for facilities heating in the Coddington Point (CP) and Coddington Cove (CC) areas of Naval Station Newport and Naval Undersea Warfare Center. The boiler plant itself is located in Coddington Cove. The scope of work includes the replacement in kind of the boiler feed water piping, from the pumps, to points of connection at each boiler, as defined on the drawings. The intent is to reuse existing hanger attachments to the structure. There are three options identified as part of this project. Replacement of a hot-well in the basement, removal of pair of abandoned 6"" Boiler Feed Water (BFW) pipes in the Boiler 3 room, and removal of an abandoned 6"" BFW on the south side mezzanine level. The existing 4"" boiler feed water (BFW) lines (2) including Insulation and corrugated jacket from the Main Boiler room, across the trestle, to the Boiler #4 room, will be removed and replaced with new Boiler Feed Water lines and insulation as noted on the drawings. Each 4"" BFW line has an associated �"" Low Pressure Steam (LPS) line (for freeze protection) which shall remain throughout construction. A 6' section of each of the �"" LPS shall be removed at each wall penetration, and replaced in like kind. Existing anchor points for the BFW line will remain and be protected throughout construction. Existing hangers and supports on the exterior trestle are to be reused. Provide temporary support of LPS lines during construction. Provide new pipe sleeves and flashing at each wall penetration. ***NOTE*** Please refer to the attached specifications and drawings for a detailed and complete description of the project.
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/e5aa3d68a55140199e5512cfee258e33/view)
 
Place of Performance
Address: Newport, RI 02841, USA
Zip Code: 02841
Country: USA
 
Record
SN05554706-F 20200209/200210120630 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.