SPECIAL NOTICE
71 -- This Notice is to Update the SOW; Answer Vendor questions and to Extend the Oral Quote Response Date. West Haven Pkg. 23 - Presentation Cabinets
- Notice Date
- 3/9/2020 12:21:09 PM
- Notice Type
- Special Notice
- NAICS
- 337215
— Showcase, Partition, Shelving, and Locker Manufacturing
- Contracting Office
- PCAC ACTIVATIONS (36A776) INDEPENDENCE OH 44131 USA
- ZIP Code
- 44131
- Solicitation Number
- 36A77620Q0174
- Archive Date
- 06/16/2020
- Point of Contact
- Bernadette.Bodzenta@va.gov
- E-Mail Address
-
bernadette.bodzenta@va.gov
(bernadette.bodzenta@va.gov)
- Awardee
- null
- Description
- SPECIAL NOTICE 36A77620Q0174 00001 West Haven Activation Pkg. 23 Cabinet, Presentation, Glass The purpose of this Amendment 0001 is to update the SOW, answer Vendor questions and to extend the quote response time for the Request for Quote (RFQ) #36A77620Q0174. See Attached SOW Rev. 3. Dated March 9, 2020. Response Date Change: FROM: Thursday March 12, 2020, 11:59 PM (Eastern) TO: Friday March 13, 2020, 11:59 PM (Eastern) Vendor questions/responses: Question 1 - Do you know if the client would like a linear or radius frame?� Answer 1 - Linear Question 2 - Do you require installation, or just shipping to site? Answer 2 Installation is required ** Question 3 - Will the installation occur the same day as the delivery day? And if multiple days are necessary for the installation is this ok? Answer 3 - Delivery and installation activities are expected to occur concurrently and be continuous.� Multiple days for installation are permissible but not greater than 3 days per the SOW. Question 4 -Is it possible that there will be multiple delivery and installation dates during the time frame listed in the SOW based upon the language used in section 2.01.02? Answer 4 - Delivery and installation activities are expected to occur concurrently and be continuous.� Multiple installation periods will not be requested or permitted. Question 5 - What are the surfaces constructed of that these will be installed on (ie. drywall w/metal studs, concrete walls, etc.)? Answer 5 - Drywall with metal stud backing. **Revised Price Schedule is attached. All other requirements remain the same.
- Web Link
-
SAM.gov Permalink
(https://beta.sam.gov/opp/4cffdfbca8024fb48115b5ad97ae7352/view)
- Record
- SN05582961-F 20200311/200309230153 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |