Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF APRIL 15, 2020 SAM #6712
SOLICITATION NOTICE

C -- 528A5-20-502 DESIGN BOILER REPLACEMENT

Notice Date
4/13/2020 12:27:42 PM
 
Notice Type
Presolicitation
 
NAICS
541330 — Engineering Services
 
Contracting Office
242-NETWORK CONTRACT OFFICE 02 (36C242) ALBANY NY 12208 USA
 
ZIP Code
12208
 
Solicitation Number
36C24220R0060
 
Archive Date
07/21/2020
 
Point of Contact
Rachel Beason Contracting Officer Rachel.Beason@va.gov
 
E-Mail Address
rachel.beason@va.gov
(rachel.beason@va.gov)
 
Small Business Set-Aside
SDVOSBC Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
 
Awardee
null
 
Description
The purpose of this amendment is to provide responses to the requests of information received. The due date for the receipt of A/E SF 330 submissions remains unchanged from the original pre-solicitation notice. Q1. What documentation is available regarding the plant and the boilers(drawings, P-3 forms, inspection reports, etc.)?�� 1A. The full solicitation will be released to the top-rated A/E firm after a full review of the qualifications in accordance with FAR Part 36.6.. The solicitation documents may include additional information such as drawings, etc.; however, the A/E firm awarded the design is required to perform their own investigations/surveys to ensure accuracy of their design. 2Q. Due to the COVID-19 Pandemic and the financial crisis it has caused small businesses, can the VA/Contracting Officer review and adjust the requirement percentages/regulations listed on pages 10 and 11 that will widen the range of qualified SDVOSB's that could bid this project?� 2A. No, the requirements set forth in the clause remain unchanged. 3Q. For proper planning of the Phasing Plan when was the last time the yearly boilers, Deaerator (DA) and condensate tank have been inspected? � 3A. This information will be up to the awarded firm to verify. 4Q. For proper planning of the Phasing Plan when was the last time the boilers VHA testing conducted? 4A.�This information will be up to the awarded firm to verify. 5Q. Will it be required for all CURRENT boiler, DA and condensate tank inspections and VHA testing be current (within a year) through all phasing operations? If so, who's responsibility is this? 5A. If required, This information will be up to the awarded firm to verify. 6Q.� Are there any subsequent plans for expansion of the facility that will effect the boiler, DA and condensate size requirements? 6A. This information will be up to the awarded firm to verify.
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/fad737b798a14cb588dc2a072159de79/view)
 
Place of Performance
Address: Canandaigua VA Medical Center;400 Fort Hill Avenue;Canandaigua, NY 14424, USA
Zip Code: 14424
Country: USA
 
Record
SN05618839-F 20200415/200413230143 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.