MODIFICATION
Y -- 8(a) Design-Build SATOC
- Notice Date
- 4/21/2020 2:05:53 PM
- Notice Type
- Solicitation
- NAICS
- 236220
— Commercial and Institutional Building Construction
- Contracting Office
- US ARMY ENGINEER DISTRICT SAVANNAH SAVANNAH GA 31401-3604 USA
- ZIP Code
- 31401-3604
- Solicitation Number
- W912HN19R3000
- Response Due
- 4/30/2020 10:00:00 AM
- Archive Date
- 08/23/2020
- Point of Contact
- Magdalena Bernard, Contracting Officer, Phone: 912-652-5131, Elizabeth Thorstad, Contract Specialist, Phone: 912-652-5161
- E-Mail Address
-
Magdalena.Bernard@usace.army.mil, Elizabeth.A.Thorstad@usace.army.mil
(Magdalena.Bernard@usace.army.mil, Elizabeth.A.Thorstad@usace.army.mil)
- Small Business Set-Aside
- 8A 8(a) Set-Aside (FAR 19.8)
- Description
- Amendment 05: A. CONTRACT CHANGES: 1. The following Seed Project pre-bid site visit documents (Attachments 10-11) are hereby added into and made a part of the solicitation. a. Attachment 10, Pierce Range, Site Visit, Attendee Roster, 19R3000 b. Attachment 11, Pierce Range, Site Visit, Memorandum for Record, 19R3000 2. TECHNICAL SPECIFICATION CHANGES: Section V, Section 00 21 00 Proposal Submission Requirements and Instructions Volume II-Technical Requirements changes are hereby added into and made a part of the solicitation as follows: From: 9. PHASE TWO � TAB D � FACTOR 3 � TECHNICAL APPROACH 9.1. SUBMISSION REQUIREMENTS. The Offeror will submit a proposal for the sample/seed project utilizing R.S. Means Cost Works. 9.2. EVALUATION CRITERIA: 9.2.1. Offerors will be evaluated on the technical approach in utilizing the applicable Construction Specification Institute (CSI) numbers and appropriate quantities from R.S. Means. To: 9. PHASE TWO � TAB D � FACTOR 3 � TECHNICAL APPROACH 9.1. SUBMISSION REQUIREMENTS. The Offeror will submit a quantitative proposal for the sample/seed project utilizing R.S. Means Cost Works. Offerors final proposed price will be submitted on Cost Breakdown Schedule D and offeror shall provide ALL supporting documents (R.S. Means break out, non-priced items, etc.). Offeror�s proposal shall be prepared and meet the requirements as stated in Notes To Offeror. 9.1.1. Offerors shall apply their proposed Area Coefficient for Fort Benning and their proposed Home Office Overhead for the base period to the SEED project 9.2. EVALUATION CRITERIA: 9.2.1. Offerors will be evaluated on the technical approach in determining a price proposal utilizing the applicable Construction Specification Institute (CSI) numbers and appropriate quantities from R.S. Means. Offerors will also be evaluated on how well they understand the required application of the proposed coefficient and mark-ups. 9.2.2 The Government will evaluate strengths, weaknesses and any deficiencies in the submission. Based on the submission provided, the Government will evaluate the Offeror�s overall quantitative approach for logic and reasonableness. The Offeror will also be evaluated on how well defined, clear and well supported the approach is for the SEED project. B. TECHNICAL SPECIFICATION CHANGES: Section 00 21 00 � Instructions, Additional Notes to Offerors, Appendix A, Section 19 Technical Requirements changes are incorporated into and made a part of the solicitation as follows: From: A. Attachments 1-9 To: A. Attachments 1-24 Amendment 04: A. CONTRACT CHANGES: 1. FAR Provision 52.228-1 is hereby replaced in its entirety. 2. TECHNICAL SPECIFICATION CHANGES: Appendix A, Seed Task Order Project technical specifications are changed as follows: a. Schedule B, Seed Task Order Project Capacity/Coefficient Schedule, is hereby removed in its entirety b. Attachment 1, Technical SOW, Pierce Range Improvements, Seed Project, 19R3000 is removed from the main body of the seed project Task Order document and is included as a separate attachment. c. Attachment 8, Pierce Range Site Visit Map, 19R3000 is hereby added to and made a part of the solicitation. d. Attachment 9, GA SAS KTR Shelter In Place Exemption Memo_6APR20, 19R3000 is hereby added to and made a part of the solicitation. 3. Appendix A, Seed Task Order Pre-bid site visit location is changed From: Bldg 6, Fort Benning, GA To: Pierce Range, Fort Benning, GA 4. Appendix A, Seed Task Order, �After Task Order Award� section is replaced in its entirety B. TECHNICAL SPECIFICATION CHANGES: Specification 01 33 16 � Design After Award is hereby added to and made a part of Appendix A, Seed Project, number 18. � Amendment 03-Phase II Only those in the competitive range and selected for Phase II may submit a proposal.
- Web Link
-
SAM.gov Permalink
(https://beta.sam.gov/opp/3436c197e4974bea834c924cea06114c/view)
- Place of Performance
- Address: +, Savannah, GA, USA
- Country: USA
- Country: USA
- Record
- SN05630366-F 20200423/200422060348 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |