Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF APRIL 24, 2020 SAM #6721
SOLICITATION NOTICE

J -- Thermal Spray; Snorkel Mast

Notice Date
4/22/2020 3:11:47 PM
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
336611 — Ship Building and Repairing
 
Contracting Office
PUGET SOUND NAVAL SHIPYARD IMF BREMERTON WA 98314-5001 USA
 
ZIP Code
98314-5001
 
Solicitation Number
N4523A20R0809
 
Response Due
4/27/2020 12:00:00 PM
 
Archive Date
05/12/2020
 
Point of Contact
Shalon D. Willis, Phone: 3604764041, Loren Frei, Phone: 3603404816
 
E-Mail Address
shalon.willis@navy.mil, loren.frei@navy.mil
(shalon.willis@navy.mil, loren.frei@navy.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
BACKGROUND � Puget Sound Naval Shipyard and Intermediate Maintenance Facility (PSNS & IMF), in support of US Submarine, requires thermal spray services for the snorkel induction standpipe, IAW T9074-AA-GIB-010/1687.� Snorkel standpipe was found to have surface defects with depths of up to 0.012in.� Scope � Thermal spray repair surfaces of snorkel induction standpipe measuring 13ft 10.3in long by 21in diameter. 2����� REFERENCES 2.1��������� DWG 501-4675662 Rev H 2.2��������� T9074-AA-GIB-010/1687 2.3��������� SMS 5120-081-026 Rev H CHG-6 3������ GENERAL REQUIREMENTS 3.1 �������� Place of Performance: Contractor�s facility 3.2 �������� Delivery Date:� 20 Nov 2020 3.4����� TECHNICAL REQUIREMENTS 3.4.1 Submit requirements per para 3.2.1, 3.2.3.2, 3.2.3.5 and 3.3.1.1 of 5.2 as part of contractor�s proposal (CDRL A001) 3.4.2�� Undercut surfaces [2], [3], and [4], shown in Figure 3 of reference (2.3), of the snorkel standpipe to the minimum amount necessary (up to 0.025in per side) to establish a suitable surface for coating. 3.4.3. Spray repair surfaces [2], [3], and [4] with Inconnel 625 type material per reference (2.2). 3.4.3. Finish machine and final polish surfaces [3] and [4] to roughness height reading 32 per SECTION 11-A of reference (2.1). 3.4.5.� Finish machine and final polish surface [2] to roughness height reading 125, or smoother, per paragraph 1.d.(5) of reference (2.3). 3.4.6� Submit one legible copy, in approved transferrable media, of the sprayed component record form that meets the minimum requirements of para. 3.1.3 of 2.2 to the COR upon completion of coating application (CDRL A002). 3.4.7� Submit one legible copy, in approved transferrable media, of a completion report for each locking ring (CDRL A002). 4��������� GOVERNMENT FURNISHED MATERIAL/SERVICES 4.1.� Snorkel Induction Standpipe � Government will ship to contractor and contractor will ship back to government. 1EA������� Snorkel Standpipe������������������������������ PN 4675662-002 $76,261.00/EA 5��������� DELIVERABLES 5.1.� Provide deliverables as described in this Statement of Work (SOW) and as outlined for format and delivery schedule in Contract Data Requirements Lists (CDRLs). �Number���� �Name����������������������������������������������������������� � Frequency����� �Quantity A001� Proof of facility, and Spray Operator, Certification� 5 days of� Award��� 1 A002� QA Record������������������������������������������������������������ Upon Completion��� 1 A003� Completion Record������������������������������������������������Upon Completion��� 1 See attached applicable clause sheet.
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/d5041af35452416eb1904de0292fec7d/view)
 
Place of Performance
Address: USA
Country: USA
 
Record
SN05632012-F 20200424/200422230134 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.