Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF AUGUST 06, 2020 SAM #6825
SOLICITATION NOTICE

F -- Grouse Creek Maintenance

Notice Date
8/4/2020 1:24:20 PM
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
115310 — Support Activities for Forestry
 
Contracting Office
Regional Office, R1 MISSOULA MT 59804 USA
 
ZIP Code
59804
 
Solicitation Number
12034320Q0211
 
Response Due
8/14/2020 2:30:00 PM
 
Archive Date
08/15/2020
 
Point of Contact
Darren Zychek, Phone: 2084768224
 
E-Mail Address
darren.zychek@usda.gov
(darren.zychek@usda.gov)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
Statement of Work On May 21st, 2020 flooding in Grouse Creek washed out FSR #280.� Emergency work was performed to divert Grouse Creek and reestablish the road.� Now that the water level has come down Grouse creek needs to be repaired and the streambank needs to be improved to withstand high flows in the future.� The rehabilitation work will take three days to complete.� The work is necessary to prevent resource damage to Grouse Creek that is highly likely when the rainy season ensues in November.� The diversion levee is made from unconsolidated stream cobbles and will not withstand a 15-20 year recurrence flood event which is common in this watershed.� In addition, the diversion channel was not constructed to reliably handle the volume of water that washed out the road.� If a similar event created the discharge that washed out the road on May 21st, the diversion levee will fail and possibly result in another washout of the road.� The probability of this type of event occurring next winter and washing out the road is high.� The road stands a better chance if the main stream channel is recontoured to its former channel dimension and the repaired streambank is fortified to withstand high flows.�� Major tasks Fortify reconstructed streambank (130�). 10-15 rootwads 50 CY streambed material 6 hours excavator time Reshape main channel (400�). 10 rootwads 6 hours excavator time Remove diversion levee (400�). 4 hours excavator time Reshape point bar and disperse LWD (300�). 4 hours excavator time 10 hours of excavator time is allotted for collection and transport of rootwads, cleanup, and sundry items. Project Location The Grouse Creek Repair project is in Bonner County, Idaho.� Directions to the Grouse Creek Repair project are as follows; Take US HWY 95 north to Colburn-Culver Road. Proceed on Colburn-Culver to Samuels Road. ��Proceed on Samuels Road to Grouse Creek Road. �Finally, drive out Grouse Creek Road to approximately the 2.5 mile mark measured from the county bridge (48� 27� 16.32�N, 116� 21� 28.90�W).
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/2750e6e0eb484e1892f3404345d8c9db/view)
 
Place of Performance
Address: Sandpoint, ID 83864, USA
Zip Code: 83864
Country: USA
 
Record
SN05744137-F 20200806/200804230146 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.