SOURCES SOUGHT
J -- Patient Lift Service and Maintenance for the East Orange and Lyons VAMC's
- Notice Date
- 8/7/2020 7:35:08 AM
- Notice Type
- Sources Sought
- NAICS
- 811219
— Other Electronic and Precision Equipment Repair and Maintenance
- Contracting Office
- 242-NETWORK CONTRACT OFFICE 02 (36C242) ALBANY NY 12208 USA
- ZIP Code
- 12208
- Solicitation Number
- 36C24220Q1041
- Response Due
- 8/11/2020 9:00:00 AM
- Archive Date
- 10/10/2020
- Point of Contact
- Janine Childs, Contracting Officer, Phone: (585) 297-1460 x72432
- E-Mail Address
-
Janine.Childs@va.gov
(Janine.Childs@va.gov)
- Awardee
- null
- Description
- SCOPE: This requirement is for annual maintenance and repair for patient ceiling lifts located at the East Orange VA Medical Center (VAMC), 385 Tremont Ave, East Orange, NJ 07018 and the Lyons VAMC, 151 Knollcroft Road, Lyons, NJ 07939. The period of performance shall be from October 1, 2020 September 30, 2021 with the provision of four option years. BACKGROUND: Vendor shall provide all labor, materials, tools, equipment and supervision of a certified-licensed technician to perform preventive maintenance and call-back repairs for equipment and associated tracks noted below at each facility. Vendor shall provide one annual preventive maintenance inspection (August of each year); 50 callbacks overall to include parts/installation. Number of callbacks either above or below will be additions/deletions to this contract. Response to callbacks shall be within 24-hours of notification. East Orange VAMC: Lift Type Lift Units Scales DPS Other Information Maxi Sky 600 Lifts 98 98 10 Includes: associated tracks and extended track on two Maxi Sky 1000 Lift 3 3 0 Includes: associate tracks Handicare Rise Atlas 625 bedlifts 6 0 0 N/A Totals 107 101 10 Lyons VAMC: Lift Type Lift Units Scales DPS Other Maxi 600 Lifts 120 0 0 Includes: associated tracks Maxi 1000 Lifts 5 0 0 Includes: associated tracks Maxi Sky 2 6 0 0 N/A Totals 131 Note: Due to ongoing changes to both medical centers the actual number and composition of the patient lifts to be services may change on an ongoing basis. Therefore, the above equipment may change. GENERAL REQUIREMENTS: General Contractor's employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site. Contractors are required to comply with the Occupational Safety and Health Act of 1970. This will include the safety and health standard found in CFR 1910 and 1926. Vendors employees must have the 10-hour OSHA certified Construction Safety course and /or other relevant competency training as determined by the VA. Training records required for all employees upon submission of quote. Under no circumstances are equipment, tools and other items of work to be left unattended for any reason. All tools, equipment and items of work must be under the immediate control of your employee. All doors to work areas will be closed and locked when rooms are left unattended. PREVENTATIVE MAINTENANCE: Perform preventative maintenance (PM) on patient ceiling lifts which shall include the following tasks and all required repairs identified during the PM services shall be addresses on the day of the inspection: Scheduled Yearly Inspection Inspect frame interlocks and hardware for service ability and missing parts Inspect cassette gears for wear Inspect connecting joints for proper attachment (cassette trolley and spreader bar) Verify that the emergency brake on the drum is turning freely Verify performance of emergency devices Inspect and torque track end stoppers Inspect visibility of bracket locking device Inspect rail joints and centering of spring pins Inspect/verify centering of rails Verify serviceability of any installed accessories (turntables and/or exchangers) Verify placement of installed fixed components Verify proper voltage output from fixed battery charger and continuous chargers Inspect complete length of lift strap for wear Inspect slings for wear Verify correct calibration of installed weight measurement devices (scales) Load test batteries Diagnose and correct system issues Vendor shall perform lift load/deflection test Upon completion of any repairs, a complete function check will be performed to ensure proper operation, serviceability and safety of use. Every 2nd Year Scheduled Inspection Perform complete yearly inspection Vendor shall provide and change lift strap Replace system batteries as per patient safety lift instructional manual. Repair Procedures: Respond to callback and place equipment in first-class operating condition based on PM parameters above. Vendor to provide all parts and materials for callback repairs. EMERGENCY SUPPORT: The contractor shall also provide an on-site technician to perform emergency repairs on the patient lift(s) call ins within twenty-four (24) hours of receiving a service call from the East Orange or Lyons VA Medical Center(s). REPORTING: Service reports must be signed by both service provider and Contracting Officer Representative (COR) at completion of work. An electronic version of same shall be sent to the COR. The appropriate VA checklist forms must be completed and signed off by the Vendor and witnessed by the COR or his representative Corrective and Preventative Maintenance Installation and Relocation SCHEDULING: The Medical Centers must maintain its operation 24 hours a day 7 days a week. Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses in operation occur. It is the contractor's responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks. All work shall take place during normal duty hours: Monday-Friday, 8:00am - 3:30pm, except work that will adversely affect Hospital operations. Requests to conduct work outside of normal duty hours must be submitted in writing at least 3 days in advance of the anticipated work to the COR. If the alternate work schedule is agreed upon, work can proceed. The original written request shall remain with all service documents along with any written agreements relative to the original requests. Contractor shall provide advance notice before arriving on station to begin any work as described herein. This advance notice must permit the VA to notify personnel in the affected buildings of the impending work. In no instance will this advance notice be less than 24 hours. The contact person for all advance notices shall be the COR. All work shall be performed, using properly trained technicians, using tools and equipment specific to the task and in a manner that is considered acceptable industry wide. At any time the COR may deem any tool, technician, or method unacceptable based on this authority of inspection/acceptance of services. All contract employees shall wear identification badges as provided by the VA. Upon completion of work, all badges shall be returned to the COR. The Contractor and all its contract employees shall comply with all regulations of the Department of Veteran s Affairs regulations and policies while working under the terms and conditions of this contract. All badges must be returned daily to the COR. Holidays observed by the VA are as follow and the vendor shall not expect access to the facility s unless otherwise notified: New Year s Day Memorial Day Columbus Day Christmas Day Martin Luther King Day Independence Day Veteran s Day President s Day Labor Day Thanksgiving
- Web Link
-
SAM.gov Permalink
(https://beta.sam.gov/opp/d84c32faabac43f3b3acdcb3af96c91b/view)
- Place of Performance
- Address: Department of Veterans Affairs East Orange VAMC Lyons VAMC, See attached Statement of Work, USA
- Country: USA
- Country: USA
- Record
- SN05749944-F 20200809/200807230144 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |