SOLICITATION NOTICE
Z -- Z--Fuel Tank Demolition and New Installation
- Notice Date
- 9/3/2020 3:00:45 PM
- Notice Type
- Solicitation
- NAICS
- 237120
— Oil and Gas Pipeline and Related Structures Construction
- Contracting Office
- PWR PORE MABO (84000) POINT REYES STATION CA 94956 USA
- ZIP Code
- 94956
- Solicitation Number
- 140P8420Q0103
- Response Due
- 9/2/2020 12:00:00 AM
- Archive Date
- 09/17/2020
- Point of Contact
- Chico, Elizabeth
- E-Mail Address
-
Elizabeth_Chico@nps.gov
(Elizabeth_Chico@nps.gov)
- Small Business Set-Aside
- SBA Total Small Business Set-Aside (FAR 19.5)
- Awardee
- null
- Description
- Amendment 0002: Due to changing requirements of the government, this solicitation 140P8420Q0103 is canceled in it's entirety. FUEL TANK DEMOLITION AND NEW INSTALLATION, OREGON CAVES NATIONAL MONUMENT AND PRESERVE, JOSEPHINE COUNTY, OREGON The National Park Service, Oregon Caves National Monument and Preserve, has a requirement for the demolition and removal of an existing underground tank and installation of two aboveground fuel storage tanks, dispensers, and fuel management system. The Contractor shall provide all supervision, labor, materials and equipment necessary to complete the work as identified in the project specifications and associated documents provided as attachments to the solicitation. Per FAR 36.204 the project range is estimated to be between $100,000 and $250,000. The North American Industry Classification System (NAICS) Code for this requirement is 237120, with a corresponding size standard of $39.5 million in annual gross receipts for the past three years. This acquisition is a Total Small Business Set-Aside. Offers are solicited only from total small business concerns. Offers received from concerns that are not small business concerns shall not be considered. The Contractor shall provide all manpower, equipment, testing, and supplies to perform the installation and related services as identified within the specifications document and any additional documents or requirements. All work shall be performed in accordance with local, state, and federal laws. The Contractor shall obtain all necessary permits required to successfully complete the work. Site work is anticipated to begin on or about September 30, 2020 and shall be completed no later than 60 days after the notice to proceed is issued. Site Visit's will be by appointment only - see Section L for more information.
- Web Link
-
SAM.gov Permalink
(https://beta.sam.gov/opp/b099ef645a0c44c793a04b18f15bee84/view)
- Record
- SN05786317-F 20200905/200903230157 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |