Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF SEPTEMBER 20, 2020 SAM #6870
AWARD

Z -- SMC B37506 MRF HVAC @ KIRTLAND AFB

Notice Date
9/18/2020 11:38:27 AM
 
Notice Type
Award Notice
 
NAICS
238220 — Plumbing, Heating, and Air-Conditioning Contractors
 
Contracting Office
W075 ENDIST ALBUQUERQUE ALBUQUERQUE NM 87109-3435 USA
 
ZIP Code
87109-3435
 
Solicitation Number
W912PP20Q0062
 
Archive Date
09/30/2020
 
Point of Contact
Glenda D. Kohlieber, Phone: 5756524135
 
E-Mail Address
glenda.d.kohlieber@usace.army.mil
(glenda.d.kohlieber@usace.army.mil)
 
Small Business Set-Aside
8AN 8(a) Sole Source (FAR 19.8)
 
Award Number
W912PP20P0048
 
Award Date
09/15/2020
 
Awardee
FOUR WINDS MECHANICAL HTC/AC INC. Albuquerque NM USA
 
Award Amount
99773.75
 
Description
The contractor shall furnish all parts, material, labor, equipment and supervision necessary to complete the work for FY-20 B37506 MRF HVAC.� The work shall include the following requirements listed in the specific requirements and a target of 74 Degrees. Demolition Contractor shall prep B37506 for installation of mini-split unit.� Existing ductwork to remain. Contractor shall remove existing furnace and prep for install of new heat pump air handling units. Construction Contractor shall use existing electrical panel and or provide subpanel, to supply power to new unit. This must be known in order to properly bid. Contractor shall provide and install (4) four - new 4-way mini-split cassettes, 24,000 BTU HVAC unit, PLFY-EP24NEMU-E or equal Contractor shall provide and install (4) four - new 4-ton AC condensers, PUMY-P48NKMU1 or equal, condensers to be mounted on East and West exterior walls. Contractor shall provide and install (2) two - new heat pump air handling units. Modify existing ductwork to new units and provide duct transition. Contractor shall provide and install condensate lines and line sets to new air handling units and cassettes. Perform 600 psi 24-hour leak check. Perform 500 micron 1-hour check with vacuum pump off. Contractor shall provide a test and balance of new system. Contractor shall plug roof vent openings and other openings as needed SOW does not include the following: Gas, plumbing, drywall, plaster and concrete Roof or ground penetrations Ceiling/tile replacement, lighting and roofing Engineering �
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/97cbe6718b47459197dfb2a0596f2369/view)
 
Place of Performance
Address: Kirtland AFB, NM, USA
Country: USA
 
Record
SN05802716-F 20200920/200918230159 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.