Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF OCTOBER 11, 2020 SAM #6891
SOLICITATION NOTICE

Y -- NV FTBR Hoover Dam Safety (1), Guardrail Improvements

Notice Date
10/9/2020 4:26:59 PM
 
Notice Type
Presolicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
6982AF CENTRAL FEDERAL LANDS DIVISI LAKEWOOD CO 80228 USA
 
ZIP Code
80228
 
Solicitation Number
6982AF21B000002
 
Archive Date
11/09/2020
 
Point of Contact
Eric Grosskreuz, Sheri Walsh
 
E-Mail Address
CFLContracts@dot.gov, CFLContracts@dot.gov
(CFLContracts@dot.gov, CFLContracts@dot.gov)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
THIS IS NOT A REQUEST FOR BID � PLANS AND SPECIFICATIONS ARE NOT AVAILABLE. Project overview The Bureau of Reclamation (USBR) has coordinated with the Central Federal Lands Highway Division (CFLHD) to assist with the design and construction of barrier improvements along the Hoover Dam Access Road. The project begins at the Clark County/USBR boundary, approximately 750 ft. west of the security checkpoint on the Nevada side and continues across the Hoover Dam, ending at the Arizona Helipad parking lot on the Arizona Side (Parking Lot 16). Based on available funding the scope of work for the project will focus primarily on barrier improvements. Proposed work includes removal and replacement of guardrail, concrete barrier and installation of pedestrian railing at select locations. Following the 30% site visit, two options have been added for surface treatments, refreshing the striping and minor improvements. The project is proposed to be delivered to acquisitions in late FY-2020 for advertisement. Award and construction are proposed for FY-2021. SIGNIFICANT QUANTITIES: The project focuses primarily on upgrading safety features, including; barrier replacement, permanent signing updates and refreshing permanent striping. Major quantities for the project are summarized below: Item� � � � � � � � � Description� � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �Unit� � � � � � �Quantity 30202-2000� � Roadway Aggregate, Method 2� � � � � � � � � � � � � � � � � � � � � �TON� � � � � � � � 1,100 61701-4500� � Guardrail System CRG, Type 2, Class A Steel Posts� ��LNFT� � � � � � � �5,150 617� � � � � � � � � � �End terminals (assorted)� � � � � � � � � � � � � � � � � � � � � � � � � � �EACH� � � � � � � � � � �16 633� � � � � � � � � ��Permanent Signing� � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �EACH� � � � � � � � � �135 63506-0500� ��Temporary Traffic Control, Flagger� � � � � � � � � � � � � � � � ��HOUR� � � � � � � �1,500 Item� � � � � � � � � Description� � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �Unit� � � � � � � � �Quantity 40601-0000� ��Fog Seal� � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � TON� � � � � � � � � � � � � 28 41402-2000� ��Cracks, Cleaning and Sealing� � � � � � � � � � � � � � � � � � � � � � ��MILE� � � � � � � � � � � � � �4 41801-2000� ��Asphalt Concrete Pavement Patch, Type 2� � � � � � � � � ��SQYD� � � � � � � � � � ��400 633� � � � � � � � � ��Permanent Signing� � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �EACH� � � � � � � � � � � ��85 63506-0500� ��Temporary Traffic Control, Flagger� � � � � � � � � � � � � � � � � ��HOUR� � � � � � � � � � 150 Item� � � � � � � � � �Description� � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � Unit� � � � � � � � �Quantity 40601-0000� � Fog Seal� � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � TON� � � � � � � � � � � � � �20 63402-1500� ��Permanent Pavement Markings� � � � � � � � � � � � � � � � � � � � ��MILE� � � � � � � � � � � � � �13 41801-2000� ��Asphalt Concrete Pavement Patch, Type 2� � � � � � � � � � SQYD� � � � � � � � � � � � �400 63506-0500� ��Temporary Traffic Control, Flagger� � � � � � � � � � � � � � � � � �HOUR� � � � � � � � � � � ��600 63506-0600� ��Temporary Traffic Control, Pilot Car� � � � � � � � � � � � � � � � �HOUR� � � � � � � � � � � ��300 CONSTRUCTION DURATION: The project is anticipated to be constructed in Winter�of 2020 into Winter 2021. The project may be under construction for 2-5 months, depending upon weather and other factors, including any limitations due to COVID-19. MISCELLANEOUS: The project will have a CAT-EX document for environmental clearance and will require night work. In addition, Davis-Bacon wages for both Clark County, NV and Mohave County, AZ will be required as work is in two states. ESTIMATED DOLLAR AMOUNT INCLUDING OPTIONS:��$1 to $3 Million
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/12ef95ae687c4a5e83a39eb6853d272f/view)
 
Place of Performance
Address: Boulder City, NV 89005, USA
Zip Code: 89005
Country: USA
 
Record
SN05825141-F 20201011/201009230139 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.