Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF OCTOBER 17, 2020 SAM #6897
SPECIAL NOTICE

61 -- J6 HIGH VOLTAGE STUDY TEAM PROCUREMENT

Notice Date
10/15/2020 1:25:51 PM
 
Notice Type
Justification
 
NAICS
541715 — Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)
 
Contracting Office
NASA GLENN RESEARCH CENTER CLEVELAND OH 44135 USA
 
ZIP Code
44135
 
Solicitation Number
80GRC020P0027J
 
Archive Date
11/14/2020
 
Point of Contact
Traci A. Patton, Phone: 216-433-5137, Dawn R. Pottinger
 
E-Mail Address
traci.a.patton@nasa.gov, dawn.r.pottinger@nasa.gov
(traci.a.patton@nasa.gov, dawn.r.pottinger@nasa.gov)
 
Award Number
80GRC020P0027
 
Award Date
09/30/2020
 
Description
NASA has formed a team of NASA specialists, and seeks to augment this team with support from a nationally recognized expert group, the Electrical Power Research Institute (EPRI), identified from market research. The goal of the team is to develop a working theory on root cause as well as formulate a corrective action plan that most effectively reduces the frequency of incident failures, minimizing the potential for extended duration utility outages and/or risk to facilities and personnel. � Phase 1 � Task 1: will focus on electrical fault data collection captured from electrical meters connected to the high voltage electrical system and the interpretation of this data as a means to analyze what is occurring in the high voltage system at GRC. � Phase 1 � Task 2: will focus on the failure analysis (as observed in Phase 1 Task 1) of components such as electrical relays that were in operation during the past failures of the high voltage system. Activities in this task will likely run in parallel with activities in Task 1. � Phase 2 � will focus on developing systemic causes for the high voltage system outages that have been occurring at GRC and develop recommendations for the GRC high voltage system program management improvements to reduce the potential for similar high voltage outages in the future. Please see attached JOFOC.
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/e778df0bf76b49f7b0642dacad6a2aa0/view)
 
Record
SN05828108-F 20201017/201015230135 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.