Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF DECEMBER 06, 2020 SAM #6947
SOLICITATION NOTICE

Y -- FY21 Maintenance Dredge, Baltimore Harbor and Channels, Maryland

Notice Date
12/4/2020 1:05:20 PM
 
Notice Type
Presolicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
W2SD ENDIST BALTIMORE BALTIMORE MD 21201-2526 USA
 
ZIP Code
21201-2526
 
Solicitation Number
W912DR21B0002
 
Response Due
12/31/2020 8:00:00 AM
 
Archive Date
01/15/2021
 
Point of Contact
Leigha Arnold, Phone: 4437492022, Tamara Bonomolo, Phone: 4109620788
 
E-Mail Address
Leigha.M.Arnold@usace.army.mil, tamara.c.bonomolo@usace.army.mil
(Leigha.M.Arnold@usace.army.mil, tamara.c.bonomolo@usace.army.mil)
 
Description
This is a Pre-Solicitation Notice. This project will be announced as W912DR21B0002. Project Description: FY21 Maintenance Dredge, Baltimore Harbor and Channels, Maryland The proposed procurement is Unrestricted, NAICS 237990 with a magnitude of construction between $10,000,000 and $25,000,000. The Government intends to solicit an Invitation for Bid (IFB) for the maintenance dredging portions of the Craighill Angle and Swan Point Federal Navigation Channels which are located in a heavy commercial waterway supporting the Port of Baltimore. It is anticipated the work would be performed in the Winter - Spring of 2021 and would consist of dredging Craighill Angle to a required depth of 51 feet MLLW with one foot of allowable over depth and dredging Swan Point to a required depth of 35 feet MLLW with one to two feet of allowable over depth. The dredging involves removal of up to 1,620,000 cubic yards of material, including allowable over depth dredging. The material will be placed at the Poplar Island Environmental Restoration Project, Talbot County, Maryland. The equipment required for this work commonly consists of two 40 plus cubic yard clamshell dredges, one 24-30-inch hydraulic unloader, six to eight large tugs, six to eight 2,500 � 6,000 cubic yard material scows, and appropriate attendant plant and pipeline. The anticipated performance period for the above described dredging and placement should not exceed 110 calendar days from receipt of Notice-to-Proceed. In order to allow for proper drying/consolidation of the dredged material at Poplar Island, a dredge material placement time of year restriction of June 15 � September 30 will be enforced. The solicitation will be provided in an electronic format, free of charge on or about 21 December 2020 to beta.SAM.gov. �Please note that all US Army Corps of Engineers acquisitions are considered sensitive, but unclassified documents and require users to have valid MPIN entered in the beta.SAM.gov systems to access package. The media through which the Government chooses to issue this solicitation will be the Internet only. This solicitation will not be issued in paper. No phone or fax request for copy of solicitation will be accepted.� Bids can be submitted after the solicitation announcement in accordance with the instructions provided within the solicitation.
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/a518bd3cc02949e0ae231c7cc25de457/view)
 
Place of Performance
Address: Baltimore, MD, USA
Country: USA
 
Record
SN05866962-F 20201206/201204230139 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.