Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JANUARY 27, 2021 SAM #6999
SOLICITATION NOTICE

F -- HAZMAT Shed removal and installation

Notice Date
1/25/2021 5:23:43 AM
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
562910 — Remediation Services
 
Contracting Office
DEPT OF COMMERCE NOAA KANSAS CITY MO 64106 USA
 
ZIP Code
64106
 
Solicitation Number
NFFR7500-21-00550KF4
 
Response Due
2/1/2021 11:00:00 AM
 
Archive Date
02/16/2021
 
Point of Contact
Kimberla Fairley, Phone: 858-546-7009
 
E-Mail Address
Kimberla.Fairley@noaa.gov
(Kimberla.Fairley@noaa.gov)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
1/25/2021 � Amendment is issued to solicitation NFFR7500-21-00550KF4 to provide vendor Questions and Answers as shown below.� All other terms and conditions remain unchanged. Q1: �Do we need to include any disposal of chemicals and/or waste currently inside the sheds? (e.g. expired, damaged container, missing lid, etc.) or do all chemicals would be transferred into the new sheds? A: No, no chemical disposal would be required besides the firefighting agent in the fixed suppression system and any waste generated by the decontamination process. Q2:� Do you require replacing the sheds with exactly the same size units? (e.g. can we provide a quote with similar or approximate size to existing?) Note that custom-build buildings would be more expensive and may take longer to manufacture. A: There can be slight variation in size, but the replacements should fit on the existing concrete pad. A like for like replacement would work best. Any alternate sizes should be specifically checked for fitment. Q3:� Can you provide the brand name or manufacturer of the existing units? A: Safety Storage Inc. Q4:� Are the new sheds to be installed in the exact same location as the current old sheds? A: Yes. Q5:� Has it been determined that the existing base/foundation would need any repairs prior to installing the new units? A: No repairs needed to the concrete foundations.� Seismic bracing may be suggested from the manufacture for any sheds above 4 feet in California.� Please follow all manufacturers suggestion for installation. Q6:� How are the current sheds secured to the ground? (e.g. bolted, nailed, or just secured by weight) A: The current structures are secured by weight. However, both replacements should be bolted and seismically braced if recommended by the manufacturer. Q7:� Would you be able to provide a temporary onsite storage for the chemicals and waste currently in the sheds? (required if the new sheds would be placed in the exact same location as the old units). A: We will be able to find an alternative location for the chemicals while the sheds are being removed/installed. Q8:� Are we supposed to put back the chemicals/waste in the new units after installation? (or would you take care of that at a later time?) A: No, we will remove the chemicals from the old units and move them into the new units after instillation and arming of the fire suppression system. Q9:� Are we allowed to cut the old sheds in smaller pieces onsite? (e.g. on an exterior area, away from vehicles and buildings, using an electrical saw cutter) A: We prefer the units are hauled away on a trailer. However, if a thorough plan is presented for cutting and hauling the sheds away we can make a decision once the plan is reviewed from a Facility/Safety standpoint. OSHA, CAL OSHA, and NFPA standards will have to be demonstrated prior. Q10:� Will you provide access to water and electrical outlets (110 V)? A: Yes. Q11:� Would you allow use of restrooms to our personnel during field activities? A: Yes. Following all site specific COVID-19 restrictions and guidelines. Q12:� Can we bring a roll off containers for metal scrap? (provided we can cut the old sheds in pieces onsite). A: Yes. Q13:� Is there enough clearance in the area where the existing sheds are to allow the use of a crane for both the removal and the installation of the sheds? A: Yes. Q14:� Is the June 1, 2021 a firm maximum date for completion of all activities? Or is there flexibility for the completion of the project? (Note that the new units may not be ready on time) A: The Contract officials have set this timeline for completion.� We would hope to meet the deadlines, but we will ask about an extension to the deadline if absolutely necessary. Q15:� Do you require a California state approval? If not, do you require a professional engineered stamped set of drawings. A: We do not require CA state approval or professional engineered stamped drawings. Q16:� Do any of these units require a fire rating (2-hour or 4-hour)? A: These structures MUST follow NFPA requirements for Chemical/Hazardous Materials storage. Specifically, NFPA 30 and NFPA 17. This includes a minimum of 2-hour fire rating. Q17:� Any heating or cooling required in either? A: No Q18:� Do you require ramps for these entrances? A: No
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/d396cbd3aeca4726807543d3b15ac350/view)
 
Place of Performance
Address: Santa Cruz, CA 95060, USA
Zip Code: 95060
Country: USA
 
Record
SN05898780-F 20210127/210125230100 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.