SAMDAILY.US - ISSUE OF MAY 13, 2021 SAM #7103
SPECIAL NOTICE

J -- 36C26221P0184 P00002_REPLACE SPS Sump Pumps & Control Panel, VASD

Notice Date
5/11/2021 8:33:31 AM
 
Notice Type
Justification
 
NAICS
238220 — Plumbing, Heating, and Air-Conditioning Contractors
 
Contracting Office
262-NETWORK CONTRACT OFFICE 22L (36C262) LONG BEACH CA 90815 USA
 
ZIP Code
90815
 
Solicitation Number
36C26221P0184
 
Archive Date
07/10/2021
 
Point of Contact
NICHOLS, CECIL S., Contracting Officer, Phone: (562) 766-2267
 
E-Mail Address
cecil.nichols@va.gov
(cecil.nichols@va.gov)
 
Award Number
36C26221P0184
 
Award Date
01/07/2021
 
Awardee
ROWE SOLUTIONS, INC. SAN DIEGO 92109
 
Award Amount
50000.00000000
 
Description
Attachment 1: Within Scope Determination Attachment 4: Determination DEPARTMENT OF VETERANS AFFAIRS Veterans Health Administration Network Contracting Office (NCO) 22 Long Beach, CA 90815 MODIFICATION (EXCLUDING OPTIONS) DETERMINATION Department of Veterans Affairs / Veterans Health Administration Network Contracting Office: NCO 22L Contract Number: 36C26221P0184 Modification Number: P00002 Modification TYPE Chosen: Bilateral Supplemental Agreement (Change Order or Supplemental Agreement) Modification REASON Chosen: Supplemental Within Scope Work (copper piping) Modification FAR AUTHORITY: FAR Clause 52.212-4 Contract Terms & Conditions Commercial Items Contractor Name: Rowe Solutions, Inc. Original Cost of Contract: $71,849.70 Modification Cost: $50,000.00 Total cost of Modifications to Date: $9,882.20 Number of days added by modification: Ninety (90) calendar days Number of days taken away by modification: Zero (0) Original Period of Performance: One Hundred Twenty (120) calendar days Total number of days added by other modifications to date: Thirty (30) calendar days Total number of days taken away by other modifications to date: Zero (0) Additional Information to Support/Justify the Modification: 1. Describe in detail the need for the changed work, time, or cost. Modification required to replace no hub coupling iron pipe with 3 L type copper pipe and pro press fittings with crimped copper couplings due to system pressure differential caused by new SPS sump pumps. Amount of within scope vendor effort requires additional time and cost to complete during the ongoing COVID-19 pandemic. 2. A statement addressing whether the proposed modification is within the original scope of the contract and specifically addressing the facts considered in reaching the conclusion. Modification is within scope as new SPS sump pumps pressure differential require replacement of 140 lf of no hub coupling iron pipe with 140lf of 3 L type copper pipe and pro press fittings with crimped copper couplings due to system pressure differential, seismic bracing, and 3 check valve. Facts and alternatives in reaching this conclusion is: 1) modify the contract, 2) solicit required modification action under a separate procurement, 3) fulfill current contract and have an inoperable system, or 4) terminate contract for convenience. The best and only alternative is to modify the existing contract due to time constraints and warranties. Requested modification action is within scope of base contract and will permit continued performance without severely impacting the hospital mission of patient care. 3. A statement analyzing the pricing factors considered in reaching a fair and reasonable price determination and identifying each Line Item Number affected, including but not limited to, IGCE, market research, and any other price analysis information. Pricing factor considered in reaching a fair and reasonable price determination include technical review by station Subject Matter Expert (SME), vendor quote, and contracting officer personal experience. 4. Were technical and legal reviews conducted based on VHAPM Part 801.602-70 Contract Reviews SOP, if not, attach HCA approved exemption, if applicable. Technical review required one level above CO per contract matrix due to time (exceeds 60 calendar days). Legal review not required since modification does not exceed $100K. DETERMINATION Based on the above, this modification is determined to be fair and reasonable and in the best interest of the U.S. Government. CECIL S. NICHOLS Date: 05/09/2021 Contracting Officer
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/55a610edb5304d80bcd60bc2aa648c4f/view)
 
Record
SN05997636-F 20210513/210511230053 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.