SOLICITATION NOTICE
H -- FY21: GVAMC, FL Fuel Tank Maintenance Services
- Notice Date
- 5/11/2021 8:21:44 AM
- Notice Type
- Combined Synopsis/Solicitation
- NAICS
- 213112
— Support Activities for Oil and Gas Operations
- Contracting Office
- 248-NETWORK CONTRACT OFFICE 8 (36C248) TAMPA FL 33637 USA
- ZIP Code
- 33637
- Solicitation Number
- 36C24821Q0647
- Response Due
- 5/17/2021 1:30:00 PM
- Archive Date
- 07/16/2021
- Point of Contact
- Shirley D Courtney, Contract Specialist, Phone: 352-381-5705
- E-Mail Address
-
shirley.courtney@va.gov
(shirley.courtney@va.gov)
- Awardee
- null
- Description
- The purpose of this amendment is to provide a response to questions and remove Supplemental Insurance Requirement clause. QUESTIONS/ANSWERS: 1. For the two steel USTs located at lot 6 North and South (50,000 gallons each) is the corrosion protection system galvanic or impressed current? Galvanic 2. For each UST: a. How many containment sumps and transition sumps for each tank system? Gainesville VA Medical Center Fuel Tanks 2021 Fuel Tank Capacity Location Containment Sumps Transition Sumps Spill Buckets North Tank 30000 Old Boiler Plant 1 1 1 South Tank 30000 Old Boiler Plant 1 0 1 Lot 6 North 50000 East of Parking Garage 1 1 2 Lot 6 South 50000 East of Parking Garage 1 1 2 CLC 2500 North of CLC 1 0 1 Bed Tower 6000 West of SW 16th st 0 0 0 Boiler Plant 40000 New Boiler Plant 3 8 1 b. Are any of the sumps deep buried (below 6 )? No 3. Does any of the diesel tanks contain biodiesel? If so, what percentage? Only #2 ULSD is used. No Biodiesel. 4. What is the manufacturer and model # of each ATG? Gainesville VA Medical Center ATG for Fuel Tanks 2021 Fuel Tank Capacity Location Make Model Serial North Tank 30000 Old Boiler Plant Office VeedeFboNotice TLS-300C C11122737305001 South Tank 30000 Lot 6 North 50000 Full Power Generator Room VeedeFboNotice Gilbarco H03186014605001 Lot 6 South 50000 CLC 2500 CLC Generator Room VeedeFboNotice TLS-300C E03156554905001 Bed Tower 6000 By Bed Tower AST Omntec OEL8000 2 Boiler Plant 40000 New Boiler Plant Pneumercator TMS 3000 C11122737305001 5. Does the AST require an SP001 inspection? No. The inspection only has to meet all the AST inspection requirements of the FDEP. 6. When filtering the fuel, do you have a micron requirement? Primary Filters, One Micron. 7. Is there an oil/water separator on-site? Lot 6 UST s have a fuel oil cleaning system. The Contractor must use their own system. The Bed Tower AST has its own fuel oil cleaning system. The Contractor must use their own system. 8. Are there any site restrictions for access to the tanks for filtering the fuel? No. 9. When was the last time the tanks were cleaned? Three of the tanks were cleaned last year. We sample every year and they were the only ones needing cleaning. 10. Could you please tell me if the Combined Synopsis/Solicitation posted as solicitation number 36C24821Q0806 will be a follow-on requirement to any work performed currently or in the past, or will this be a new requirement? Is this a new requirement or an established program with an incumbent? New contract, previous contract expired. 11. Supplemental Insurance Requirement clause is hereby removed in entirety from solicitation 36C24821Q0647.
- Web Link
-
SAM.gov Permalink
(https://beta.sam.gov/opp/e35010c09f424a71a579b208dbd3d8b6/view)
- Record
- SN05997777-F 20210513/210511230054 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)