SOLICITATION NOTICE

99 -- HALF PANEL ASSEMBLY

Notice Date
10/19/2021 6:52:52 AM
 
Notice Type
Solicitation
 
NAICS
333999 — All Other Miscellaneous General Purpose Machinery Manufacturing
 
Contracting Office
NAVSUP WEAPON SYSTEMS SUPPORT PHILADELPHIA PA 19111-5098 USA
 
ZIP Code
19111-5098
 
Solicitation Number
N0038322QP022
 
Response Due
11/18/2021 12:00:00 AM
 
Archive Date
12/03/2021
 
Point of Contact
Telephone: 2156973533
 
E-Mail Address
VLADIMIR.MAKSIMCHUK@NAVY.MIL
(VLADIMIR.MAKSIMCHUK@NAVY.MIL)
 
Description
ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2016)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|invoice and receiving report combo type||TBD|N00383|TBD|TBD|see schedule|TBD||||||||| NOTE FOR CONTRACTOR/ADMINISTRATIVE CONTRACTING OFFICER|4||||| Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in this contract. Required RTAT: ## 0059 days after receipt of asset Throughput Constraint: Contractor must provide a throughput Constraint for each NSN(s). Total assets to be repaired monthly after initial delivery commences X/month (contractor fill in #). A throughput of ##____ per month reflects no throughput constraint. Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer. IF A FIRM FIXED PRICE (FFP) CANNOT BE DETERMINED, PLEASE INFORM THE PCO. THESE ITEMS REQUIRE GOVERNMENT SOURCE APPROVAL PRIOR TO AWARD. IF YOU ARE NOT AN APPROVED SOURCE, YOU MUST SUBMIT, TOGETHER WITH YOUR PROPOSAL, THEINFORMATION DETAILED IN THE NAVSUP WSS SOURCE APPROVAL BROCHURE WHICH CAN BE OBTAINED ONLINE AT https://www.navsup.navy.mil/public/navsup/wss/business_opps/ UNDER ""COMMODITIES."" OFFERS RECEIVED WHICH FAIL TO PROVIDE ALL DATA REQUIRED BY THE SOURCE APPROVAL BROCHURE WILL NOT BE CONSIDERED FOR AWARD UNDER THIS SOLICITATION. PLEASE NOTE, IF EVALUATION OF A SOURCE APPROVAL REQUEST SUBMITTED HEREUNDER CANNOT BE PROCESSED IN TIME AND / OR APPROVAL REQUIREMENTS PRECLUDE THE ABILITY TO OBTAIN SUBJECT ITEMS IN TIME TO MEET GOVERNMENT REQUIREMENTS, AWARD OF REQUIREMENT MAY BE CONTINUED BASED ON FLEET SUPPORT NEEDS. 1. SCOPE 1.1 . Markings shall be in accordance with MIL-STD-130. 1.2 . The contractor shall include on the detailed process/operation sheets developed, (1) all in house manufacturing processes and (2) the identity of all manufacturing sources performing processes/operations outside their facility. These sheets shall not be revised or altered after the successful completion of First Article or Production Lot Testing without approval from the Basic Design Engineering activity, via the PCO. 1.3 . Unless otherwise specified, for fabricated parts, the Inspection Method Sheets/ Final Inspection Sheets shall list the characteristics of each item produced under the contract. The manufacturer shall be required to provide certifications of all raw material including castings and forgings. the material source shall be identified and the documentation shall be able to identify the customer and/or contract number. The manufacturer shall maintain all raw material documentation for a minimum of ten (10) years. The contractor is responsible for providing completed Inspection Method Sheets/Final Inspection Sheets showing the actual dimensions taken for ALL Characteristics,in addition, critical characteristics shall be annotated. 1.4 The components being acquired under this solicitation have been classified as Flight Critical requiring engineering source approval by the Naval Air Systems Command. Only those companies who have submitted requests for source approval and been approved will be eligible for award under this solicitation. Any company not previously approved may submit a Source Approval Request to the contracting officer, Naval Inventory Control Point, (See Block 10 of the SF33 for name and code). The Source Approval Request shall contain the following documentation and shall be submitted by the closing date of this solicitation: (A) Copy of complete configuration drawings for a similar item(s) which your company has produced within the past three years, including test procedures for which your company (1) has been qualified to manufacture and (2) which is similar, i.e., requires the same materials, manufacturing processes, inspections, tolerances and similar application as the item(s) for which you are seeking approval. (B) Copy of the complete process/operation sheets used to manufacuture the similar item, including but not limited to, detailed shop sketches. These plans must note those operations and processes performed by subcontractors/ vendors. (C) Complete copies of purchase orders, shipping documents, etc. that document delivery of production quantities of the part to the Original Equipment Manufacturer or Military service. Provide the most recent copies of the documents. (D) A detailed comparative analysis of the differences/similarities between the similar part and the part(s) for which you are seeking approval. This analysis should include materials, configuration, tolerances, process requirements, dimensions, castings, forgings, etc. (E) Copy of inspection method sheets used in the manufacturing and at final inspection. These sheets should include actual tolerance, print requirements, inspection devices, sources performing the operation and level of inspection. Critical characteristics should be discernible from all other characteristics. The above requirements are a subset of requirements specified in the ASO Source Approval Information Brochure dated January 1995. The submission of this data subset is contingent upon and in consideration of the submitting contractor meeting all other requirements specified in this solicitation to include a bilateral agreement with MDA which includes availability of complete data, MRB disposition, etc. Any company not having such agreement, but desiring to seek engineering source approval, will be required to submit data meeting all requirements of the ASO/NAVICP Source Approval Brochure. 1.5 The components being acquired under this solicitation have been classified as Flight Critical requiring engineering source approval by the Naval Air Systems Command. Only those companies who have submitted requests for source approval and been approved will be eligible for award under this solicitation. Any company not previously approved may submit a Source Approval Request to the contracting officer, Naval Inventory Control Point, (See Block 10 of the SF33 for name and code). The Source Approval Request shall contain the following documentation and shall be submitted by the closing date of this solicitation: (A) Copy of complete configuration drawings for a similar item(s) which your company has produced within the past three years, including test procedures for which your company (1) has been qualified to manufacture and (2) which is similar, i.e., requires the same materials, manufacturing processes, inspections, tolerances and similar application as the item(s) for which you are seeking approval. (B) Copy of the complete process/operation sheets used to manufacuture the similar item, including but not limited to, detailed shop sketches. These plans must note those operations and processes performed by subcontractors/ vendors. (C) Complete copies of purchase orders, shipping documents, etc. that document delivery of production quantities of the part to the Original Equipment Manufacturer or Military service. Provide the most recent copies of the documents. (D) A detailed comparative analysis of the differences/similarities between the similar part and the part(s) for which you are seeking approval. This analysis should include materials, configuration, tolerances, process requirements, dimensions, castings, forgings, etc. (E) Copy of inspection method sheets used in the manufacturing and at final inspection. These sheets should include actual tolerance, print requirements, inspection devices, sources performing the operation and level of inspection. Critical characteristics should be discernible from all other characteristics. The above requirements are a subset of requirements specified in the ASO Source Approval Information Brochure dated January 1995. The submission of this data subset is contingent upon and in consideration of the submitting contractor meeting all other requirements specified in this solicitation to include a bilateral agreement with MDA which includes availability of complete data, MRB disposition, etc. Any company not having such agreement, but desiring to seek engineering source approval, will be required to submit data meeting all requirements of the ASO/NAVICP Source Approval Brochure. The contractor shall notify NAVICP Code 072 when material required by this contract has been shipped to Destination.This shall be accomplished by sending a copy of the DD Form 250, Material Inspection and Receiving Report to: Naval Inventory Control Point ATTN: Code 072 700 Robbins Avenue, Phila., PA 19111 or by submitting a facsimile to FAX: (215)697-2524, ATTN: Code 072. 1.6 Sampling rates (AQLs) indicated below shall be used in accordance with ANSI Z1.4 for Single Sampling and a General Inspection Level of II. 1.7 In addition to the 100% PCO Mandatory, critical and major characteristics, attributes for plating, hardness and non-destructive testing will be inspected one hundred percent. 1.8 Contractor shall develop a system for identification of individual piece parts for traceability purposes. Markings shall not be permanent. 1.9 An AQL of 1.5 will be used for Class 3 threads and dimensions, and geometric feature controls with a tolerance range of .010 or less. 1.10 For minor characteristics, a sampling rate determined by the contractor and subject to QAR approval will be used. 1.11 The material covered in this contract/purchase order will be used in a crucial shipboard system enabling the launch and/or recovery of aircraft. The use of incorrect or defective material would create a high probability of failure resulting in a serious personnel injury, loss of life, loss of vital shipboard systems or loss of aircraft. Therefore,the material has been designated as Critical material and special control procedures are invoked to ensure receipt of correct material. 1.12 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;NAWC LAKEHURST; drawing number ( ;30003; ) ;2056AS0609-1; , Revision ;J; and all details and specifications referenced therein. 1.13 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.14 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C. 1.15 Articles to be furnished hereunder shall be repaired, tested and inspected in accordance with the terms and conditions specified in the Requirements Section of this document. 1.15.1 Any item contracted for repair SHALL have a Statement of Work to ensure compliance with all repair procedures and requirements. Repair of: HALF PANEL ASSEMBLY ;1710-01-550-4239; NSN , ;2056AS0609-1; Part Number, Shall be performed IAW: HALF PANEL ASSEMBLY ;REPAIR/OVERHAUL/INSPECT IAW APPLICABLE REPAIR MANUALS, TECHNICAL SPECIFICATIONS, ENGINEERING ORDERS AND DRAWINGS REV J; Publication (s). 1.15.2 There will be no repair deviation from the approved written procedures without review and acceptance by the Basic Design Engineer. All requests for Waiver/Deviation shall be via Form 1694 routed throught the Local DCMA/ACO office for review and recommendations via form 1998. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS - NOT APPLICABLE 4. QUALITY ASSURANCE 4.1 CRITICAL MANUFACTURING PROCESSES ( ; ; ) HEAT TREAT ( ;APPLIES; ) WELDING ( ; ; ) CADMIUM PLATING ( ; ; ) ENGINEERING CHROME PLATING ( ; ; ) NICKEL CHROME PLATING ( ; ; ) CASTING(S) ( ; ; ) FORGING(S) ( ; ; ) MPR (MATERIAL PROCESSING REQUIREMENTS) 4.2 . Mandatory Inspection Requirements: 100% Procurement Contracting Officer (PCO) mandatory inspection is required and shall be accomplished at source under the surveillance and final approval of the cognizant DCMAO Quality Assurance Representative (QAR). During production, mandatory inspection is required to be accomplished by the contractor as follows: A. Level of Inspection (LOI). 1. Critical characteristics: 100% inspection shall apply. 2. Major and Minor characteristics: LOI shall be in accordance with a sampling plan acceptable to the QAR. B. Critical characteristics: ;ALL ACTUAL DIMENSIONS OF ANY MAJOR OR CRITICAL CHARACTERISTICS SHALL BE RECORDED. THE AMBEINT TEMPERATURE SHALL BE RECORDED AT TIME MEASUREMENTS ARE TAKEN. CERTIFICATIONS TO BE ON FILE FOR A MINIMUM OF SEVEN YEARS AFTER DELIVERY OF CONTRACT; C. Major and Minor characteristics 1. Shall be defined by the contractor subject to QAR concurrence, unless defined on applicable drawings and associated specifications. 4.3 SPECIAL INSPECTION REQUIREMENTS ( ; ; ) MAGNETIC PARTICLE INSPECTION ( ;APPLIES; ) SURFACE INSPECTION ( ; ; ) PENETRANT INSPECTION ( ; ; ) RADIOGRAPHIC INSPECTION ( ; ; ) ULTRSONIC INSPECTION ( ; ; ) HIGH SHOCK TEST ( ; ; ) MECHANICAL VIBRATION TEST 4.4 FINAL INSPECTION REQUIREMENT:Due to the critical nature of this item, representatives of the buying office/and the cognizant field activity, NAWC Lakehurst, shall be notified by the successful contractor at least 14 days prior to presentation to the DCM QAR of the items for final inspection so that they may have the option of witnessing the final inspection. The contractor shall notify by email or TELEFAX PCO and NAWC Lakehurst QA ;DCMA/QAR; to arrange for the final inspection.The authority of the QAR shall not be abrogated. If the notification is not given to both sites then the QAR shall not accept the units. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE THIS IS A ALRE ITEM FOR THE ARC SYSTEM. FOR DRAWING UPDATES, SEE ATTACHED NAWC LKE DRAWING UPDATE SHEET. NAVSUP REFERENCE ONLY: (18-10130): OVERHAUL TDR THE COMPONENTS BEING ACQUIRED UNDER THIS SOLICITATION HAVE BEEN CLASSIFIED AS ""CRITICAL"" REQUIRING ENGINEERING SOURCE APPROVAL BY NAVAL AIR SYSTEMS COMMAND ONLY THOSE COMPANIES WHO HAVE SUBM& BEEN APPROVED WILL BE ELIGIBLE FOR AWARD UNDER THIS SOLICITATION ANY COMPANY SUBMIT A SOURCE APPROVAL REQUEST AS OUTLINED IN THIS SOLICITATION. \ DATE OF FIRST SUBMISSION=ASREQ ACCEPTANCE TEST REPORT ALL DRAWINGS REQUIREMENTS, CERTIFICATIONS. TEST REPORTS, AND IN-PROCESS INSPECTION DOCUMENTS NEEDED TO SUBSTANTIATE PRODUCT QUALITY SHALL BE AVAILABLE WHEN PRESENTED FOR FINAL INSPECTION AT CONTRACTORS FACILITY TO THE LOCAL QAR/ DCMA DATE OF FIRST SUBMISSION=ASREQ Overhaul Procedure The overhauling contractor or activity shall provide a step by step overhaul prcedure for disassembly and reassembly. The overhaul procedure shall be subject to NAVAIR approval prior to commencing overhaul. The procedure shall include SUGGESTED quality assurance ""hold points"" as required to ensure that any CSI/CAI components or processes that cannot be adequately inspected at final assembly are accessible for proper interim inspection.
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/1a986ba2128e4614992d51f94ab2f740/view)
 
Record
SN06160558-F 20211021/211019230113 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.