Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF MARCH 03, 2022 SAM #7398
AWARD

Y -- Middle Logan Creek Flood Risk Management Project, Phase 2 Randolph, NE

Notice Date
3/1/2022 3:02:24 PM
 
Notice Type
Award Notice
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
W071 ENDIST OMAHA OMAHA NE 68102-4901 USA
 
ZIP Code
68102-4901
 
Solicitation Number
8156
 
Archive Date
03/16/2022
 
Point of Contact
Lynne D. Reed, Phone: 4029952039, MAJ Brandon Wagner, Phone: 4029952905
 
E-Mail Address
lynne.d.reed@usace.army.mil, brandon.c.wagner@usace.army.mil
(lynne.d.reed@usace.army.mil, brandon.c.wagner@usace.army.mil)
 
Small Business Set-Aside
SDVOSBC Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
 
Award Number
W9128F22C0008
 
Award Date
03/01/2022
 
Awardee
Iron Mike Construction Llc CO 80112-3922 USA
 
Award Amount
7996440.40
 
Description
The flood risk reduction project is along the Middle Logan Creek in� Randolph, Nebraska. The work reach extends from� approximately 550-feet� upstream of County Line Road (558th Ave) to 150 feet upstream of Sholes� Road bridge. The work in general comprises: 1)�� �Earthwork/grading for the realigned and widened Middle Logan Creek�channel -excavating existing channel to a widened channel bottom of 40�feet with 95-foot top width, 3:1 side slopes, and a 5-foot wide and 1-foot�deep low flow channel. 2)�� �Transition from natural channel approximately 400 feet upstream of�558th Ave bridge to the trapezoidal widened channel section. 3)�� �Channel improvements with erosion and grade control, placement of�new riprap, and other erosion control include turf reinforcement mat,�seeding, erosion control blanket, silt fence, etc. 4)�� �New and extended storm drain structures. 5)�� �Removal and replacement of Main St., Douglas St., and 558th Ave�bridges. 6)�� �Removal of a 42-foot long pedestrian bridge, not to be replaced. 7)�� �Horizontal roadway realignment for Main St. bridge and vertical�roadway realignment for the approaches to Main St., Douglas St. and 538th�Ave bridge. 8)�� �Shoo flybridge detour for 558th Ave bridge construction. 9)�� �New 3 strand barb wire fencing, new concrete pavement, and new�aggregate pavement; and 10)�� �Installation of a new sanitary sewer siphon system and four domestic waterlines.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/6a466c4dc20b42219fa12b6dd76fb352/view)
 
Place of Performance
Address: Randolph, NE 68771, USA
Zip Code: 68771
Country: USA
 
Record
SN06253081-F 20220303/220301230056 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.