Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF APRIL 01, 2022 SAM #7427
SOLICITATION NOTICE

Y -- ND FLAP 136(1) & 145(1) Tewaukon Structures

Notice Date
3/30/2022 2:26:53 PM
 
Notice Type
Presolicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
6982AF CENTRAL FEDERAL LANDS DIVISI LAKEWOOD CO 80228 USA
 
ZIP Code
80228
 
Solicitation Number
6982AF22B000011
 
Response Due
4/14/2022 1:00:00 PM
 
Point of Contact
CFL Acquisitions
 
E-Mail Address
CFLAcquisitions@dot.gov
(CFLAcquisitions@dot.gov)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
THIS IS NOT A REQUEST FOR BID - PLANS AND SPECIFICATIONS ARE NOT AVAILABLE. PROJECT DESCRIPTION:� Located within the Tewaukon National Wildlife Refuge near Lake Tewaukon in SE corner of North Dakota, this project is to provide safe routes for recreationists and access to the Tewaukon National Wildlife Refuge.� The existing routes have narrow bridges in poor condition that have been overtopped during recent flood events.� Sargent County and Tewaukon National Wildlife Refuge has identified opportunity to replace bridge structures at 2 sites that are reaching the end of service life span. At site 1 the project will replace the existing 18 ft x 18 ft bridge on 145th Ave SE over LaBelle Creek and at site 2 the project will replace the existing 23 ft x 24 ft bridge on 136th Ave SE over Wild Rice River. Both sites include removing the existing structure, installing a concrete box culvert, installing armoring, raising embankment construction, widening and gravel resurfacing the existing roadway approaches. The project is divided into a Schedule A and Option X . Schedule A is 145th Ave SE, LaBelle Creek. Proposed structure double 12�W x 10�H. Precast Concrete Box Culvert with precast Double 12�W x 10�H RCBC end sections. The existing bridge and channel have been removed and widened by the maintaining ditch company. The existing road has been removed and will be replaced as part of the installation of the proposed structure. Option X is 136th Ave SE, Wild Rice River. Proposed structure double 12�W x 10�H. Precast Concrete Box Culvert with precast Double 12�W x 10�H RCBC end sections. The existing bridge and abutments are still in place and require removal as part of this project. This project includes impacts to wetlands, but the impacts are estimated to be less than 0.1 Acres. SCOPE OF THE WORK:� �The scope of the project is for the replacement of structures across Labelle Creek. The work consists of placing 2 reinforced concrete box culverts including installing concrete box culverts, headwalls, wingwalls, installing armoring, grade raise, embankment construction, widening, signing, gravel resurfacing, revegetation of approximately 1500 ft of roadway approaches. The proposed structural section is aggregate surfacing course 6-inch depth placed on embankment. Proposing contractor designed pre-cast box culverts and wingwalls. Reference 601, 602 special contract requirements. ANTICIPATED SCHEDULE:� Advertise: March 2022 Award: April 2022 Construction Duration: 5 Months ESTIMATED PRICE RANGE: Between $500,000 and $1,000,000 CONSTRUCTION DURATION: Construction is anticipated between May 2022 and October 2022.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/fae0bc988e3845dbb12ec35a3c533b9f/view)
 
Place of Performance
Address: Rutland, ND 58067, USA
Zip Code: 58067
Country: USA
 
Record
SN06284025-F 20220401/220330230102 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.