SOLICITATION NOTICE
Z -- T2 Boiler Plant Repairs - Ft Harrison (VA-22-00052578)
- Notice Date
- 5/26/2022 11:45:28 AM
- Notice Type
- Solicitation
- NAICS
- 236220
— Commercial and Institutional Building Construction
- Contracting Office
- NETWORK CONTRACT OFFICE 19 (36C259) Greenwood Village CO 80111 USA
- ZIP Code
- 80111
- Solicitation Number
- 36C25922R0057
- Response Due
- 6/2/2022 1:00:00 PM
- Archive Date
- 07/02/2022
- Point of Contact
- Jared Detton (CS), Contract Specialist
- E-Mail Address
-
jared.detton@va.gov
(jared.detton@va.gov)
- Awardee
- null
- Description
- AN AMENDMENT TO SOLICITATION 36C25922R0057 POSTED ON May 26, 2022. The purpose of this amendment is as follows: Effectively, posts answers to questions submitted by potential offerors. Provides drawings for Building 141. Effectively updates clause 852.236-71 Specifications and drawings for construction adding Drawing Boiler (Bldg 141) . See updated clause below. All offers are due 06/02/2022 no later than 2:00 PM Mountain Time (MT), and shall be emailed to Jared Detton at Jared.Detton@va.gov. All other items and conditions remain the same. 4.16 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (APR 2019) The clause entitled Specifications and Drawings for Construction in FAR 52.236 21 is supplemented as follows: (a) The Contracting Officer s interpretation of the drawings and specifications will be final, subject to the Disputes clause. (b) The Contractor shall (1) Check all drawings and specifications furnished immediately upon receipt; (2) Compare all drawings and the specifications, and verify the figures before laying out the work; (3) Promptly notify the Contracting Officer of any discrepancies; (4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and (5) Reproduce and print contract drawings and specifications as needed. (c) In general (1) Drawings of greater detail shall govern over drawings of lesser detail unless specifically noted otherwise; and (2) Figures and numerical quantities noted on drawings govern over scale measurements. (d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications. (e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings: Title File Drawing No. Drawing Drawing (Boiler Plant Floor Plan) 01 Manual Boiler Safety Device Testing Manual 5th Edition 02 Manual VHA Steam Design Manual (Vol 1 & 2) 03 VHA Directive VHA Directive 1810(1)_Boiler and Boiler Plant Ops 04 Drawing Drawing Boiler (Bldg 141) 05
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/4e73da5cb8e74dd99aa782d103524e57/view)
- Record
- SN06339935-F 20220528/220526230100 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |