Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF AUGUST 05, 2022 SAM #7553
SOLICITATION NOTICE

Z -- Mark Twain National Forest - Houston Office Drainage Construction

Notice Date
8/3/2022 9:45:12 AM
 
Notice Type
Solicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
USDA-FS, CSA EAST 13 Atlanta GA 303092449 USA
 
ZIP Code
303092449
 
Solicitation Number
12445522Q0166
 
Response Due
8/26/2022 2:00:00 PM
 
Archive Date
09/10/2022
 
Point of Contact
John Swizdor
 
E-Mail Address
john.swizdor@usda.gov
(john.swizdor@usda.gov)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
The Houston Ranger District Office requires construction to install drainage pipe. �DESCRIPTION OF WORK Scope:�All removal areas will be clearly marked by COR.� Contractor is responsible for calling dig rite and utility location if any.� Includes saw cutting asphalt and concrete pavement.� Excavation of soil, asphalt and concrete pavement, loading on trucks and disposing material by contractor off site.� Placement of 1� clean aggregate as bedding material under and around pipe, drop inlets and junction box.� Drop inlets shall be placed at shown elevations for proper drainage and slope, and HDPE pipe shall be placed accordingly.� All excavated areas will be back filled with 1� clean aggregate including area of parking lot between the oil house and warehouse were asphalt pavement is removed.� A new 4� concrete reinforced pavement will provide drainage as shown in drawings to drop inlets.� This pavement will use #3 rebar and concrete mix design submitted to COR.� All material shall conform to FP-14 or MoDOT specifications.� No material testing will be completed by contractor, any necessary material testing will be performed by Forest Service if needed.� Any disturbed soil areas shall be regraded and seed/straw placed.� ���� Notes:�Included is a material list with specifications from SI Precast/ Murdon Concrete Products. Contractor must use these products or an approved equal. Work shall be completed within a 30 day time frame.� �������������������������� The Forest service is unaware of any utilities in work area except a water hydrant line at far end of building.� However contractor still needs to contact dig-rite utility locator.� There is no traffic signage needed but site must be marked of any hazards.� This may include construction fence, cones, baricades or safety devices so that vehicles or pedestrians are made aware of any hazards.� A safe walk way for pedestrians must be provided to and from the front door of the warehouse at all times. �������������������������������������� � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �� Parking lot and construction area will be free of vehicles during the 30 day construction period.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/27643dd6bb224f94a24983a01ae5f6d2/view)
 
Place of Performance
Address: Houston, MO 65483, USA
Zip Code: 65483
Country: USA
 
Record
SN06412687-F 20220805/220803230112 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.