Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF SEPTEMBER 02, 2022 SAM #7581
SOLICITATION NOTICE

Y -- Replace Chillers at Energy Center, Bonham Texas, Project No

Notice Date
8/31/2022 8:51:52 AM
 
Notice Type
Presolicitation
 
NAICS
238220 — Plumbing, Heating, and Air-Conditioning Contractors
 
Contracting Office
257-NETWORK CONTRACT OFFICE 17 (36C257) ARLINGTON TX 76006 USA
 
ZIP Code
76006
 
Solicitation Number
36C25723B0009
 
Response Due
10/13/2022 8:00:00 AM
 
Archive Date
01/11/2023
 
Point of Contact
Joyce M Mills, Contract Specialist, Phone: 254-899-6026
 
E-Mail Address
joyce.mills@va.gov
(joyce.mills@va.gov)
 
Awardee
null
 
Description
Presolicitation Notice: The Network Contracting Office, NCO17 anticipates awarding a Firm-Fixed-Price construction contract for, Replace Chillers at Energy Center, Project No. 549A4-20-700 located at the Sam Rayburn Memorial Veterans Center (VAMC), 1201 East 9th Street, Bonham, TX 75418. The method of procurement shall be an Invitation for Bid (IFB) in accordance with the procedures set forth in Parts 14 and 36 of the Federal Acquisition Regulation (FAR), with an estimated issue date of September 13, 2022, and a projected bid due date of October 12, 2022. Contractor shall provide all necessary labor, materials, equipment and supervision to completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for VA Project Replace Chiller at Bldg. 11 Boiler Plant, as required by provide SOW, Specification and Drawings. Work includes general construction, demolition, and alterations necessary for replacement of existing chiller, pumps and associated appurtenances, and installation of new chiller, pumps and associated appurtenances, including the necessary removal of existing structures, equipment pads and construction of certain other items. Electrical Work: Work includes all labor, material, equipment, and supervision to perform the required electrical construction work on this project as indicated in the construction documents. Mechanical Work: Work includes all labor, material, equipment, and supervision to perform the required Mechanical construction work on this project as indicated in construction documents. All work shall be performed during normal working hours, Monday Friday, 7:30am 5:00pm. Project duration shall be 240 calendar days from receipt of the Notice to Proceed (NTP). This requirement is a competitive offer, Set Aside 100% for Service Disabled Veteran Owned Small Business (SDVOSB). Bids will only be accepted from certified SDVOSB contractors. The applicable NAISC code is 238220, $16.5 Mil. The magnitude of the construction estimated cost range: $1,000,000.00 - $2,000,000.00.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/ac7b8d0959904dd1823ac5876015716a/view)
 
Record
SN06448453-F 20220902/220831230134 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.