SPECIAL NOTICE
Y -- AZ FS 24(1) Buffalo Crossing Bridge
- Notice Date
- 10/31/2022 12:13:01 PM
- Notice Type
- Special Notice
- NAICS
- 237310
— Highway, Street, and Bridge Construction
- Contracting Office
- 6982AF CENTRAL FEDERAL LANDS DIVISI LAKEWOOD CO 80228 USA
- ZIP Code
- 80228
- Solicitation Number
- 6982AF23SN0001
- Archive Date
- 12/30/2022
- Point of Contact
- CFL Contracts
- E-Mail Address
-
CFLContracts@dot.gov
(CFLContracts@dot.gov)
- Description
- SPECIAL NOTICE � PRESHOW ACCESS TO PROJECT SITE THIS IS A SPECIAL NOTICE FOR SITE ACCESS FOR AN UPCOMING PROJECT THAT WILL BE ADVERTISED FOR BID PLANS AND SPECIFICATIONS ARE NOT AVAILABLE PROJECT NUMBER:� AZ FS 24(1) PROJECT NAME:� Buffalo Crossing Bridge Site Access:� Monday, November 14, 2022, through Thursday, November 17, 2022 Objective: To provide interested bidders with project information and access to the project site prior to the winter weather conditions. Questions and Answers: NO QUESTIONS will be answered during the site-visits. All questions arising from the contractor site visits must be submitted in writing to CFLContracts@dot.gov and will be answered via email and SAM.gov. Please note the project is still under development so there may be questions cannot be answered until Advertisement. Defer those questions to the formal solicitation phase of the project. PROJECT DESCRIPTION:� This project is located in the Apache-Sitgreaves National forest in western-central Arizona. The terrain is rolling and mountainous with elevations ranging up to 7600 ft. This project consists of replacing an existing bridge structure on Forest Route 24 (MP 10.0) over the East Fork Black River in Greenlee County, Arizona.� The existing 3-span bridge�s overall length is 90.0-ft and width (out-out) measures 30.9-ft.� The bridge was built in 1962 and sees heavy logging truck traffic. The capacity has deteriorated due to loading and age. The load rating was recently dropped making this a candidate for replacement. The adjacent sections of roadway will also be reconstructed to match a new a raised bridge elevation. The project consists of a single construction schedule (Schedule A). SIGNIFICANT QUANTITIES Line Item, Unit, Estimated Quantity Removal of Bridge, LPSM, 1 Embankment Construction, CUYD, 7,000 Roadway Aggregate, TON, 4,100 Asphalt Concrete Pavement, TON, 770 Structural Concrete, Class A, CUYD, 55 Prefabricated Steel Bridge (26�x 98�), LPSM, 1 Drilled Shaft, 24-inch Diameter, LNFT, 120 Guardrail System, LNFT, 385 ENGINEER�S ESTIMATE:� Estimated cost for the base schedule is $2.0 to $5.0 million. CONSTRUCTION DURATION:� It is anticipated that this project will be advertised during winter 2022/2023 with construction beginning in March 2023 and extending through October 2023. Anticipated advertisement in December 2022 Anticipated bid opening in January 2023 Anticipated Award in March 2023 Anticipated Notice to Proceed in March 2023. The roadway can be closed during construction Please coordinate with the Apache-Sitgreaves National Forest with any access issues during the preshow dates. Contact information is below: NOTE: Mr. Miller will not be able to answer project related questions. Please submit those to CFLContracts@dot.gov. Chris Miller, P.E. Forest Engineer Forest Service Apache-Sitgreaves National Forests P: 928-333-6274 christopher.miller5@usda.gov 30 S. Chiricahua Drive Springerville, AZ �85938 *All details listed are also included in PDF format in the Attachments/Links section of this notice
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/7c6dd1bae6a647bc8ac67f28a7ed1e6c/view)
- Place of Performance
- Address: Alpine, AZ 85920, USA
- Zip Code: 85920
- Country: USA
- Record
- SN06505821-F 20221102/221031230107 (samdaily.us)