Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF NOVEMBER 02, 2022 SAM #7642
SOURCES SOUGHT

99 -- Exhaust Stack and/or Industrial Chimney inspections

Notice Date
10/31/2022 4:56:01 AM
 
Notice Type
Sources Sought
 
NAICS
561790 — Other Services to Buildings and Dwellings
 
Contracting Office
SRNS - DOE CONTRACTOR Aiken SC 29801 USA
 
ZIP Code
29801
 
Solicitation Number
SRNS10272022STACKINDUSTRYCHIMNEYINSPECTION
 
Response Due
11/28/2022 2:00:00 PM
 
Point of Contact
Barbara McCarty, Phone: 8039526119
 
E-Mail Address
barbara.mccarty@srs.gov
(barbara.mccarty@srs.gov)
 
Description
****This is a REQUEST FOR INTEREST ONLY! This request does not constitute a request for proposal, request for quote, or invitation for bid. The intent of this request is to identify potential offerors for mark research purposes only***** Savannah River Nuclear Solutions, LLC (SRNS), which manages and operates portions of the Savannah River Site (SRS) under a Department of Energy (DOE) prime contract, solicits expressions of interest from potential suppliers who have a strong background in Exhaust Stack and/or Industrial Chimney inspections. The SRS complex is located approximately 15 miles south of Aiken, South Carolina and is 310 contiguous square miles. Request for Information (RFI) Revised 10/31/22 - see Scope Summary, first paragraph, changed approximate room temperature. Scope Summary: Provide an internal stack inspection at SRS for an active stack. The stack has a flow rate of 111,121 cfm and exit velocity of 2,220 fpm. The temperature of air flow exiting the stack is approximately room temperature (69 degrees F to 72 degrees F). The stack is 200 feet high. 296-H is comprised of a 183�-8� concrete chimney without stack liner sitting atop a reinforced concrete foundation. The chimney varies in size and thickness from 12�-11 7/8� outer diameter with 10� thickness at its base, reducing down to outer diameter of 11.04� and 6� thickness at 90 feet, and then maintains 6� thickness while reducing in size to an outer diameter of 9�-0�.� The stack foundation is 25�-0� tall in total, with the bottom 4�-0� comprised of a 36�-0� wide octagonal Footing. 1.� During the inspection the stack flow rate and velocity can be reduced to 32,360 cfm and the air���� ���exiting the stack would be approximately 647.2 ft/min. 2.� Potential for radiation contamination on equipment. However � SRNS will have our Radiological Team during planning, and any work being done.� 3.� Ability to perform work scope by not �touching� stack (i.e. no climbing of the stack, no attaching�� ��equipment on the stack, etc.). 4.� Provide report and pictures/videos of stack to determine status of structure. A supplier's response to the RFI does not guarantee they will be selected to participate in the RFP. Suppliers responding to this RFI shall include evidence of the following: 1.� Overview of how the subcontractor intends to perform a non-destructive and/or visual inspection on an active stack with similar specs. 2.� Examples of past performance in stack inspection.� For example, a report of an inspection that was previously completed.�������� E-mail response addressing Items 1 and 2 above shall be submitted by 5:00 p.m. est. on 11/28/22 to Barbara McCarty at barbara.mccarty@srs.gov.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/2dbada722d3d47cc98c25150e3eb7e02/view)
 
Place of Performance
Address: Aiken, SC 29808, USA
Zip Code: 29808
Country: USA
 
Record
SN06506481-F 20221102/221031230112 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.