Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JANUARY 22, 2023 SAM #7726
SOLICITATION NOTICE

H -- MANUFACTURE OF TREATMENT SYSTEM COMPONENTS FOR VOC REMOVAL BY GAC

Notice Date
1/20/2023 7:32:15 AM
 
Notice Type
Solicitation
 
NAICS
332311 — Prefabricated Metal Building and Component Manufacturing
 
Contracting Office
ARGONNE NATL LAB - DOE CONTRACTOR Lemont IL 60439 USA
 
ZIP Code
60439
 
Solicitation Number
3-B175-Q-00137-00
 
Response Due
2/1/2023 3:00:00 PM
 
Archive Date
02/01/2023
 
Point of Contact
Jenna Doria-Garner, Phone: 6302526988
 
E-Mail Address
jdoria@anl.gov
(jdoria@anl.gov)
 
Description
Please see Statment of Work attached for specifications, requirements, and designs. The period of performance is from contract start to September 2023 Argonne National Laboratory (Argonne) is assisting the U.S. Department of Agriculture (USDA) in the implementation of a Corrective Action Plan (CAP) to address groundwater contamination at a site in Powhattan, Kansas. The remedial action identified in the CAP will employ a pump and treat system, extracting groundwater from selected wells followed by volatile organic compound (VOC) removal by granulated activated carbon (GAC) treatment units, and effluent discharge. This document serves as the statement of work (SOW) for manufacture of treatment system components (Product) for the remedial action. Argonne requires lump sum pricing for the manufacture of the treatment system components. The treatment system will include GAC treatment units; bag filters, a sequestrant addition system for scaling/fouling prevention; an air compressor for the operation of (2) pneumatic downhole pumps; and communications; process control; and electrical equipment for operating and monitoring the treatment system remotely,. The treatment system and associated equipment will be housed in a pre-manufactured groundwater treatment plant (GTP) building. Piping will be installed by others from the individual extraction wells to the GTP and connected inside the building to a manifold header before flowing through the GAC treatment units and eventually being discharged. Flow meters will be installed on each individual well influent line and on the effluent discharge line. The Vendor will be responsible for preparing shop drawings and the fabrication of the treatment building and all required equipment and piping, including the manifold header piping with individual well lines fitted with all required flow meters, strainers, sample ports, etc. as specified in the Performance Requirements (Attachment 1) and the Final Design Drawings (Attachment 2). Installation of piping from wellheads to the treatment building and connection of piping at the building will be performed by others.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/df636bac0c6e48b2aaaf34fd1ae642fe/view)
 
Place of Performance
Address: USA
Country: USA
 
Record
SN06569193-F 20230122/230120230103 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.