Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF AUGUST 26, 2023 SAM #7942
AWARD

99 -- Repair Flooring in Bldg#1097, Osan AB

Notice Date
8/24/2023 7:08:51 PM
 
Notice Type
Award Notice
 
Contracting Office
0906 AQ CO CONTRACTING BAT APO AP 96202-0000 USA
 
ZIP Code
96202-0000
 
Solicitation Number
W90VN6-23-F-0013
 
Archive Date
09/01/2023
 
Point of Contact
Chaeyong Yi, Phone: 7576018
 
E-Mail Address
chaeyong.yi5.ln@army.mil
(chaeyong.yi5.ln@army.mil)
 
Award Number
W91QVN-19-D-0008
 
Award Date
12/08/2022
 
Awardee
REAMIAN CONSTRUCTION CO.,LTD Seongnam-si 13477 KOR
 
Award Amount
245838.57
 
Description
Architectural Works: Commander/Admin Office Area, 2F (Phase I) Replace/install existing carpet with new ones in R-201, 207 & 213. Replace/install existing carpet with WLT provided by Government and apply caulk along the gap between the new finish and existing cove base in R-208, 209, 212 & 214A (GFCI). � Replace/install existing floor finish with new vinyl composition tile (VCT) and apply caulk along the gap between the new VCT and existing cove base in R-203, 204, 205, 206, 210, 211, 215, 216, 217, 218, 220, 221, 222, 223, 224, 226, 228. ��� Replace existing acoustical ceiling tiles with new ones in the area (R-201, 207, 208, 209, 210, 211, 212, 213, 214A, 215, 216, 217, 218, 220, 221, 222, 223, 224, 226, 228) Replace existing thresholds with new ones in the area. ��������� Central Operation Area, 1F (Phase II) Replace/install existing carpet tiles with new ones in R-136, 137, 138, 139, 140, 141, 142, 143, 144 & 157. Replace existing acoustical ceiling tiles with new ones in R-140, 141, 142, 143 & 157. ��������� Admin Area, 2F (Phase III) Replace/install existing floor finish with new VCT in the area and apply caulk along the gap between the new finish and existing cove base (R-214, 219, 230, 231, 232, 233, 234, 235, 236, 240, 243, 245, 246, 247, 248, 249, 250, 251, 252, 253, 254, 255, 256, 257, 258, 259, 260, 261, 262, 263, 264, 265, 285, 290, 291 & 292). ���� Replace existing acoustical ceiling tiles with new ones in the area. Replace existing thresholds with new ones in the area. ��������� Side Area, 1F (Phase IV) Replace existing carpet tiles with new ones in R-113 in the area. Replace/install existing floor finish with new VCT and apply caulk along the gap between the new finish and existing cove base in R-114, 123, 124, 125, 126, 127 & 129. Replace existing acoustical ceiling tiles with new ones in the room & corridor area (R-113, 114, 123, 124, 125, 126, 127, 129, 131, 132, Corridor-2 &3). Move (dismantle and reassemble if necessary) all the furniture such as desk, couch, chair, credenza, etc and electrical equipment such as desktops, printers, etc in the office and put them back where they were when the work finished.�� The contractor shall be responsible to repair all damages to existing areas which are not in the contract caused by this project and to match condition to adjacent areas.� Remove all debris originated from the work and clean up the job site.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/d375b3f891b444ac9dfacdb49f4f2497/view)
 
Record
SN06804898-F 20230826/230824230050 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.