SPECIAL NOTICE
61 -- Customized Trailer Generator
- Notice Date
- 9/12/2023 10:07:14 AM
- Notice Type
- Special Notice
- NAICS
- 333924
— Industrial Truck, Tractor, Trailer, and Stacker Machinery Manufacturing
- Contracting Office
- W7N6 USPFO ACTIVITY WAANG 141 FAIRCHILD AFB WA 99011-9439 USA
- ZIP Code
- 99011-9439
- Response Due
- 9/18/2023 2:00:00 PM
- Archive Date
- 10/03/2023
- Small Business Set-Aside
- SBA Total Small Business Set-Aside (FAR 19.5)
- Description
- The 141st ARW Contracting Office Intends to award a single source contract.�� The 141st Security Forces Squadron (SFS) located at Fairchild AFB WA requires a Custom Trailer Generator to be installed, that Becker Trailers LLC has uniformly provided to support the Air National Guard Domestic Operation / Less than Lethal ( LTL) Trailer fleet.� �The Generator and Trailer Modification to the Security Forces DOMOPS Less Than Lethal (LTL) trailers by incorporating a commercial grade 5,500 watt on-board generator package, 20-gallon fuel tank and custom tongue mounted aluminum generator compartment. This custom generator will provide power to the LTL Trailer during all hours of operations. The Becker Trailers Generator has the ability to provide 5,500 Watts to support or 6K power requirement. Each unit will mounted to the trailer as a permanent solution. Each generator is CARB and EPA approved allowing us to operate in different states based on local restrictions and laws. The trailers are mounted with NPS generators which utilize inverter technology allowing better protection to sensitive equipment. Becker Custom Trailers has performed all necessary testing to ensure easy of install as well as ensuring the equipment has an internal air transport certification. It�s imperative that the modification to the trailers are a seemliest modification that allows for little to no customization or retrofitting process to ensure compatibility assurance, but also for ease of management, training, and redundancy purposes.� Using any other source than Becker Trailers LLC will increase cost to the taxpayer cause mission delay due to increased training needs and potential troubleshooting due to incompatibility issues requiring more custom fabrication.
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/351b5119a4ad4a36909961c6d38c9f8c/view)
- Record
- SN06827521-F 20230914/230912230102 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |