SOURCES SOUGHT

99 -- Market Research-WVA Radial Forge Infrastructure

Notice Date
10/16/2023 8:49:10 AM
 
Notice Type
Sources Sought
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
W2SD ENDIST NEW YORK NEW YORK NY 10278-0004 USA
 
ZIP Code
10278-0004
 
Solicitation Number
W912DS24S0002
 
Response Due
10/30/2023 11:00:00 AM
 
Archive Date
11/14/2023
 
Point of Contact
Denisse M. Soto, Phone: 9177908177, Francis Cashman, Phone: 9177908173
 
E-Mail Address
denisse.m.soto@usace.army.mil, francis.cashman@usace.army.mil
(denisse.m.soto@usace.army.mil, francis.cashman@usace.army.mil)
 
Description
Project Description: Radial Forge Infrastructure. New and upgraded infrastructure is necessary for a new radial forge to be located in Building 135 at Watervliet Arsenal (WVA) in Watervliet, New York. The radial forge infrastructure project is one component of a larger comprehensive plan for WVA to replace the existing circa 1970 SX?55 Rotary Forge with an RX?70 Radial Forge. WVA is contracting directly with an equipment manufacturer to design and install the forge equipment and foundation. The Radial Forge requires new and upgraded infrastructure to function including process water, compressed air, power and data. WVA also requires infrastructure for operations including domestic water for washdown, drainage from the forge basement, dust/exhaust extraction for optimal working conditions, lighting in the forge basement, and other utility infrastructure improvements in and around Building 135. ����������� Work may include but is not limited to infrastructure demolition work, site improvements, installation of an electrical substation, installation of new power distribution equipment to deliver power to the new equipment, installation of a new baghouse and associated ductwork, installation of a new cooling tower and associated pumps and piping, installation of a standalone control system for the infrastructure, installation of a standalone compressed air system,� expansion and renovation of an existing control tower, architectural upgrades, life health and safety upgrades, installation of limited fire alarm and fire protection service, restoration of disturbed areas, and commissioning of all installed systems under the USACE contract. Extensive coordination throughout the life of the project with the equipment manufacturer, equipment installer, WVA, and USACE will be required.� The magnitude of the project is between $10 million to $25 million.� Duration of construction will be approximately 1005 calendar days after Notice to Proceed. Notice to Proceed is anticipated to occur in APRIL 2023.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/9e1f1039023f42fa923ffc073c9f6274/view)
 
Place of Performance
Address: Watervliet, NY, USA
Country: USA
 
Record
SN06860714-F 20231018/231016230050 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.