Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF NOVEMBER 08, 2023 SAM #8016
SOURCES SOUGHT

C -- C-5 HUMP PANEL KIT

Notice Date
11/6/2023 11:26:25 AM
 
Notice Type
Sources Sought
 
NAICS
336413 — Other Aircraft Parts and Auxiliary Equipment Manufacturing
 
Contracting Office
FA8526 AFLCMC WLMKA ROBINS AFB GA 31098-2428 USA
 
ZIP Code
31098-2428
 
Solicitation Number
FA8525-24-HUMPPANEL
 
Response Due
12/7/2023 2:00:00 PM
 
Archive Date
12/22/2023
 
Point of Contact
Benjamin Morris
 
E-Mail Address
benjamin.morris.6@us.af.mil
(benjamin.morris.6@us.af.mil)
 
Description
REQUEST FOR INFORMATION C-5 HUMP PANEL KIT The Government is conducting market research to identify potential Commercial (FAR Part 12) contractors to assemble/provide and build parts kits to support a C-5 Super Galaxy aircraft modification for fairing structure over a wing splice in accordance with USAF drawings and technical data which will be provided upon contract award.� These services include the acquisition, organizing, and kit building as described herein.� The kit shall include parts identified by NSN and as authorized by C-5 Super Galaxy Technical Data and non-stocklisted parts.� Non-stocklisted parts will be provided by the Government at no cost to the contractor, prepackaged and delivered to the contractor.� The kit shall include approximately 3,000 small aerospace qualified screws, fasteners and hardware, approximately 8 sheets of primed phosphoric anodized aluminum sheet 0.032 thickness by approximately 8 ft by 2 ft.� All anodizing shall be in accordance with BAC 5555, �Phosphoric Acid Anodizing of Aluminum for Structural Bonding�, latest revision.� Priming and storage of all PAA material shall be in accordance with BAC 5514-589, �Application of Corrosion Inhibiting Adhesive Primer�, latest revision.� Disposable NSNs include materials necessary to accomplish sealant bonding in accordance with C-5 Super Galaxy technical data.� Limited Life items include, but may not be limited to, approximately four cases of authorized sealant, cleaning solutions, and clean rags/wipes.� See Figure 1, �Wing Station 120 Kits�.� See Table 1, �WS 120 Parts List� at the end of this document. Contractor shall furnish all material, support equipment, tools, test equipment, and services. The contractor is responsible for providing, maintaining, and calibrating all support equipment required at their facility or a subcontractor�s facility. Contractors/Institutions responding to this market research are placed on notice that participation in this survey may not ensure participation in future solicitations or contract awards. The government will not reimburse participants for any expenses associated with their participation in this survey. Questions relative to this market research should be addressed to Benjamin Morris at Benjamin.morris.6@us.af.mil. Responses to RFI must be sent via email to: Benjamin.morris.6@us.af.mil are due 7 Decmeber 2023 by 5:00 pm.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/6560c237b6b14a21897371a854433403/view)
 
Place of Performance
Address: USA
Country: USA
 
Record
SN06877409-F 20231108/231106230132 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.