MODIFICATION
Y -- 558-19-305 XR2 Pharmacy Processing System
- Notice Date
- 1/3/2024 11:43:10 AM
- Notice Type
- Solicitation
- NAICS
- 238210
— Electrical Contractors and Other Wiring Installation Contractors
- Contracting Office
- 246-NETWORK CONTRACTING OFFICE 6 (36C246) HAMPTON VA 23667 USA
- ZIP Code
- 23667
- Solicitation Number
- 36C24624B0002
- Response Due
- 2/6/2024 7:00:00 AM
- Archive Date
- 05/15/2024
- Point of Contact
- Sean A Cosby, Contracting Officer
- E-Mail Address
-
Sean.Cosby@va.gov
(Sean.Cosby@va.gov)
- Awardee
- null
- Description
- Project 558-19-305 XR2 Pharmacy Processing System Site Prep STATEMENT OF WORK Page 2 of 2 Page 2 of 2 XR2 Pharmacy Processing System Site Preparation (Construction) Project 558-19-305 STATEMENT OF WORK Preparation of existing pharmacy space for installation of the Omnicell XR2 Packaging Unit General: The scope of this project is to prepare a portion of the existing pharmacy space for the installation of the Omnicell XR2 Packaging Unit. This unit will be installed by the VA after this project is complete. The pharmacy is in Building 1, 1st Floor F-wing at the Durham Veterans Affairs Medical Center in Durham, NC. Work will include limited demolition and finishes in the Pharmacy. Mechanical and electrical improvements will be completed in the interstitial space on the 2nd floor above the Pharmacy. This project includes the installation of a new air compressor and associated power and piping. The air compressor will be located on the concrete slab portion of the 2nd floor interstitial space above the pharmacy department. Access to this space from within the building requires traversing on a walk-on ceiling with a maximum weight capacity of 25 psf. There are two options for accessing this concrete slab portion with heavy, large equipment or materials as follows: Transport of the air compressor can be from the facility s loading dock, through the building to the 2nd floor interstitial space. Access to the concrete slab portion of this space will require the air compressor unit to be broken down into sections to adhere to the loading limits of the walk-on ceiling. Access to this concrete portion of this interstitial space can also be accomplished through an existing removable louver in the exterior wall of the building. This louver is located near the designed installation location of the air compressor. However, delivery of any material or equipment using this means will require an extended reach fork-lift to accomplish the transfer from the outside parking area and through the louver to inside the building. Lift equipment will be obtained by contractor. Reinstallation of the louver will require recaulking of its perimeter at the building. The final conditions of the project will be a space with improved interior finishes and utilities compatible with the requirements of station sourced equipment. Work will be executed in the First and Second Floors of F-Wing, Building 1, Durham VA. Construction Cost: Estimated cost of construction: $100,000 - $250,000. Construction Duration: 150 Calendar days from notice to proceed (NTP). Phasing: Project construction will be phased as indicated on drawings. Construction Services: Perform work as described above and in accordance with professionally developed design drawings and specifications. Place of Performance: Tasks will be performed at the VA Medical Center, Durham, NC. Work will be in an occupied healthcare facility in operation 24 hours a day. Hours of Performance: Construction will be during business hours, 0730-1600, Monday through Friday with all federal holidays observed. Additional time outside of this allowed time may be authorized by VA. END STATEMENT OF WORK -
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/72ed017df31b49a9b7cbe1b9e26fb194/view)
- Record
- SN06925423-F 20240105/240103230041 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)