Z -- Project# 626-22-201 Upgrade Oxygen

Notice Date
1/8/2024 12:42:25 PM
 
Notice Type
Solicitation
 
NAICS
238910 — Site Preparation Contractors
 
Contracting Office
249-NETWORK CONTRACT OFFICE 9 (36C249) MURFREESBORO TN 37129 USA
 
ZIP Code
37129
 
Solicitation Number
36C24924B0007
 
Response Due
1/17/2024 11:00:00 AM
 
Archive Date
02/16/2024
 
Point of Contact
Michael R Brown, CONTRACTING SPECIALIST
 
E-Mail Address
MICHAEL.BROWN1305@va.gov
(MICHAEL.BROWN1305@va.gov)
 
Awardee
null
 
Description
36C24924B0007 RFI s Project #626-22-201, Upgrade Oxygen, Nashville VAMC There is no Spec section for the Commissioning and TAB requirements. Please provide this information. A: No commissioning required. All certifications should be in accordance with Spec Section 22 63 00 paragraph 3.2 On PG010D confirm that at note 1 at Riser 4 & 4A these pipes are existing, and no new work is required. A: Risers 4 & 4A shown for reference and are existing. New work is shown as 1 1/2 line to room next to closet G-46. Confirm if the piping shown on PG101D is for information and no new work is required? A: Piping shown on PG101D is for information and no new work is required. Confirm if the piping shown on PG102A is for information and no new work is required? A: Piping shown on PG102A is for information and no new work is required. Confirm if the piping shown on PG102D is for information and no new work is required? A: Piping shown on PG102D is for information and no new work is required. Confirm if the piping shown on PG104C is for information and no new work is required? A: Piping shown on PG104C is for information and no new work is required. Is there gypsum ceiling removal and replacement required in any areas with demoed or new pipe? If so, what areas? A: Gypsum hard ceiling work located on following pages: PG100D (ER, PACU), PG101C (ER). Remaining areas are either sub-basement or access through acoustical ceiling tile. Can the site superintendent act as the site safety and quality control person? A: No Will tie ins have to be done after hours or on weekends? A: If the area effected by tie in is vacant after hours or on weekends, YES. In-patient areas can be conducted during business hours but must be coordinated 21 calendar days in advance.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/b6666ee6bc644cdeb6d3f6be2d678573/view)
 
Record
SN06929652-F 20240110/240108230044 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.