Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF FEBRUARY 16, 2024 SAM #8116
SPECIAL NOTICE

61 -- Repair of a damaged Basic Expeditionary Airfield Resources (BEAR) Power Unit (BPU)

Notice Date
2/14/2024 1:23:13 AM
 
Notice Type
Special Notice
 
NAICS
335312 — Motor and Generator Manufacturing
 
Contracting Office
FA5613 700 CONS PK APO AE 09021-3076 USA
 
ZIP Code
09021-3076
 
Solicitation Number
FF3N0613339A001
 
Response Due
2/27/2024 5:00:00 AM
 
Archive Date
03/13/2024
 
Point of Contact
Svetlana Allendorf, Phone: 011496315366885, Jennifer Arnett
 
E-Mail Address
Svetlana.Allendorf.ru@us.af.mil, jennifer.arnett.1@us.af.mil
(Svetlana.Allendorf.ru@us.af.mil, jennifer.arnett.1@us.af.mil)
 
Description
Cummins is the sole manufacturer of the BPU (BEAR Power Unit). They have access to programs specifically designed to run tests on their generators that no other company has access to.� It can run on multiple fuels (JP-8, JP-5, Jet A, DF 1,2), operate in wide temperature range and delivers excellent power quality. DQBPU is an integrated power options in a mobile configuration, with reliable and stable power. Repair of a damaged Basic Expeditionary Airfield Resources (BEAR) Power Unit (BPU). The DQBPU is designed for BEAR. It uses military Power Command Control and offers significant operational advantages for all military services.� The BEAR Power Unit is one of USAFE's most highly tasked BEAR Unit Type Codes. Historically, the BPU has been tasked to areas such as Air Base 201 in Niger, Kunsan Ab Korea, and many different NATO exercises in the European theater. This $900K generator can provide vital primary power requirements to bed-down sites downrange as well as back up for critical facilities. The generator cannot be repaired locally or by Air force personnel and must be repaired by the manufacturer, Cummins. The Front axle of the BPU needs complete replacement. Radiator Cores need complete replacement due to damage and leaks. Front/Left/Bottom panels need to be replaced. The trailer has to be completely replaced. After all repairs are made, a complete test of the BPU needs to be accomplished to ensure everything runs safely and correctly. A fully mobile and operational BPU is required to meet the mission requirement. If the work is not performed, it will not be repaired and will amount to a loss of Air Force assets and degrade readiness for USAFE's and the 86 MMS's mission in providing mission ready War Reserve Mater. For detailed information, see damage report attached.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/d01537d75e644c52ae4f9129ddae3921/view)
 
Place of Performance
Address: Rumst 2840, BEL
Zip Code: 2840
Country: BEL
 
Record
SN06965464-F 20240216/240214230050 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.