Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF FEBRUARY 18, 2024 SAM #8118
SOLICITATION NOTICE

43 -- PUMP, CENTRIFUGAL

Notice Date
2/16/2024 11:20:52 AM
 
Notice Type
Presolicitation
 
NAICS
333914 — Measuring, Dispensing, and Other Pumping Equipment Manufacturing
 
Contracting Office
NAVSUP WEAPON SYSTEMS SUPPORT MECH MECHANICSBURG PA 17050-0788 USA
 
ZIP Code
17050-0788
 
Solicitation Number
N0010423QJD95
 
Response Due
2/23/2024 1:30:00 PM
 
Archive Date
03/09/2024
 
Point of Contact
Gregory Blissman
 
E-Mail Address
gregory.blissman@navy.mil
(gregory.blissman@navy.mil)
 
Description
** Accelerated delivery is encouraged and accepted before the delivery date(s) listed in the schedule. ** All freight is FOB Origin. This RFP is for repair. The resultant award of this solicitation will be issued bilaterally, requiring the contractor's written acceptance prior to execution. Verify nomenclature, part number, and NSN prior to responding. The Government is seeking a Repair Turnaround Time (RTAT) of: 100 days Government Source Inspection (GSI) is required. Please note freight is handled by Navy CAV or Proxy CAV as stated in NAVSUPWSSFA24 or NAVSUPWSSFA25. Your quote should include the following information: ***************QUOTE AMOUNT AND RTAT *************** *Unit Price:__________ *Total Price:__________ *Repair Turnaround Time (RTAT): _______ days If your company is not quoting the Government's Required Repair Turnaround Time (RTAT) or earlier, provide your company's capacity constraints? _________________________________________________________________ _________________________________________________________________ _________________________________________________________________ Repair Turnaround Time (RTAT): the resultant contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in this contract. *Check one: Firm-fixed-Price ___ Estimated ___ NTE ___ *Return Material Authorization # (RMA), if applicable:__________ *Delivery Vehicle (if Delivery Order requested) (if your company has a current BOA/IDIQ, for example) : N0010423GZU01 ***************TESTING AND EVALUATION IF BEYOND REPAIR*************** *T&E fee/price (if asset is determined BR/BER): If an item is determined BR, and the contractor provides documentation that costs were incurred during evaluation and determination of BR, the contracting officer will negotiate a reduced contract price, not-to exceed (NTE) $___________associated with the repair effort to reflect the BR status of the equipment. *The T&E fee (if asset is determined BR/BER) was determined/computed based on:______________________________________. ***************AWARDEE INFO & PERFORMANCE LOCATION*************** *Awardee CAGE: __________ *Inspection & Acceptance CAGE, if not same as ""awardee CAGE"": __________ *Facility/Subcontractor CAGE (where the asset should be shipped), if not same as ""awardee CAGE"":__________ *************** IOT COMPARE REPAIR PRICE TO PRICE TO BUY NEW*************** *New unit price:__________ *New unit delivery lead-time:__________ IMPORTANT NOTE: Any asset for which the contractor does not meet the required RTAT will incur a price reduction per unit/per month the contractor is late - any delay determined to be excusable (e.g. Government Delay) will not result in a price reduction. If a price reduction is required due to unexcusable contractor delay, the Contracting Officer will implement the aforementioned price reduction via a ""reconciliation modification"" at the end of the contract performance. Price reductions made pursuant to this section shall not limit other remedies available to the Government for failure to meet required RTATs, including but not limited to the Government's right to terminate for default. INSPECTION AT ORIGIN ACCEPTANCE AT ORIGIN
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/26569697a19740f29808fb93a7d670d4/view)
 
Place of Performance
Address: USA
Country: USA
 
Record
SN06969153-F 20240218/240216230057 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.