SOLICITATION NOTICE
Z -- Boundary Dagger Road Project in the Salmon-Challis NF
- Notice Date
- 4/16/2024 1:34:09 PM
- Notice Type
- Presolicitation
- NAICS
- 237310
— Highway, Street, and Bridge Construction
- Contracting Office
- Salmon and Challis National Forests SALMON ID 83467 USA
- ZIP Code
- 83467
- Solicitation Number
- 1202L3
- Response Due
- 5/1/2024 11:00:00 AM
- Archive Date
- 05/16/2024
- Point of Contact
- Erick Plamann
- E-Mail Address
-
erick.plamann@usda.gov
(erick.plamann@usda.gov)
- Small Business Set-Aside
- SBA Total Small Business Set-Aside (FAR 19.5)
- Description
- The project consists of preparing pits, mining materials, crushing pit material into blended aggregate with commercial source additives meeting contract requirements and performing the following: SLBD 2 items (Roads 579 and 568): Base Bid: 6 miles of crushed and placed Aggregate Surface Course, to a typical compacted depth of 4� on roads 579 (NFSR 40579 Stanley-Landmark or �Bear Valley Rd�) and 568 (NFSR 40568 or Boundary-Dagger Rd). Also includes 10.50 miles of roadbed reconditioning. Option Items: **Up to 4.5 miles of crushed and placed Aggregate Surface Course, to a typical compacted depth of 4� on road 579. Select cleaning of culverts and bridge decks. Seafoam Road items (Road 008) - (starting after completion of 579 and 568 items): Base Bid: 3.9 miles of crushed and placed Aggregate Surface Course, to a compacted depth of 4� on road 008 (NFSR 40008 Beaver Creek Rd or �Seafoam Rd�). Also includes 7.10 miles of roadbed reconditioning. Option Item: **Up to 3.2 miles of crushed and placed Aggregate Surface Course, to a typical compacted depth of 4� on road 008. NOTE: Aggregate items shall utilize Blind Summit Pit or another approved source by the CO, including commercial source(s). ** ��Up to� items are subject to availability of funds and not to exceed the quantity listed in the SCHEDULE OF ITEMS. Crush and Stockpile Aggregate includes development and use of pits, either government source or commercial source, to the specified gradation, including adding approximately 2% bentonite by weight to achieve desired properties. Actual % will be based on contractor�s initial materials testing. This includes clearing and grubbing, removing overburden, mining, crushing, mixing aggregate with bentonite using a pugmill, weighing, creating stockpiles (including any loading or hauling to create stockpiles), testing, and final site reclamation including placing overburden, waste materials, mulching, and seeding. Perform the work in accordance with MSHA 30 CFR, part 56. Surfacing - Aggregate Surface Course includes necessary surface preparations before placing aggregate such as: material and quality control testing, surface preparation (reconditioning), clearing and grubbing, spreading, watering, compacting, temporary traffic control, erosion control measures, and all other incidental work to surface the road (see surfacing typical on sheet G-07 and attached road logs). Surface to the compacted depth specified in the attached road logs the full roadway width, including all existing turnouts and widenings. Intersecting roads shall be bladed, shaped and surfaced for a smooth transition. Spread control and staking for aggregate is the responsibility of the contractor. Protect the environment and resources impacted by all construction activity according to
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/9b1cd2d2c27145b0a5a0e279dda753f5/view)
- Place of Performance
- Address: Shoup, ID 83469, USA
- Zip Code: 83469
- Country: USA
- Zip Code: 83469
- Record
- SN07031966-F 20240418/240416230049 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |