SOURCES SOUGHT
D -- Next Generation Gateway (NGG) Phase 2 RFI
- Notice Date
- 4/19/2024 8:35:35 AM
- Notice Type
- Sources Sought
- NAICS
- 334210
— Telephone Apparatus Manufacturing
- Contracting Office
- FA8726 AFLCMC HNK C3IN HANSCOM AFB MA 01731-2100 USA
- ZIP Code
- 01731-2100
- Solicitation Number
- NGG_Phase2_RFI
- Response Due
- 5/3/2024 10:00:00 AM
- Archive Date
- 05/18/2024
- Point of Contact
- Daniel J. Dornfeld, Jr, Contracting Officer, Major Patrick Wu, Program Manager
- E-Mail Address
-
daniel.dornfeld.2@us.af.mil, hunghao.wu.1@us.af.mil
(daniel.dornfeld.2@us.af.mil, hunghao.wu.1@us.af.mil)
- Description
- NGG modernizes existing DAF infrastructure to provide Zero Trust Capabilities.� The NGG implementation must be capable of sustaining a throughput of 40Gb/s (threshold)/ 100Gb/s (objective) at the CEDCs and 10Gb/s (threshold)/ 40Gb/s (objective) at the base boundary (Main Operating Bases). NGG Phase 1 is currently being deployed to 13 CEDCs.� NGG Phase 2 will extend the rollout of a Zero Trust solution to all 187+ Main Operating Bases (MOBs), which include the 13+ CEDCs from Phase 1 and the 174+ base boundaries (Main Operating Bases). �NGG Phase 2 will determine architecture, design, functionality, products, and integration services to deploy a suitable solution to a flexible infrastructure on both NIPRNet and SIPRNet sites.� These solutions must be able to support integration with approved Cloud Service Providers.� This includes integration with SaaS and Cloud ONE (Azure, AWS, GCP, and OCI) for UNCLASS (IL2 � IL5), and SECRET (IL6) through DoD approved connections.
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/2beb0cd843484a89891c08e719e4c998/view)
- Place of Performance
- Address: Bedford, MA, USA
- Country: USA
- Country: USA
- Record
- SN07037012-F 20240421/240419230048 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |