Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF APRIL 25, 2024 SAM #8185
SOLICITATION NOTICE

Z -- SF WC Shop Roof Replacement

Notice Date
4/23/2024 12:04:59 PM
 
Notice Type
Solicitation
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
USDA-FS, CSA INTERMOUNTAIN 8 Ogden UT 844012310 USA
 
ZIP Code
844012310
 
Solicitation Number
1240LT24Q0038
 
Response Due
5/21/2024 11:00:00 AM
 
Archive Date
06/05/2024
 
Point of Contact
Tony Taylor - Contract Specialist, Brian Beam
 
E-Mail Address
tony.taylor@usda.gov, brian.beam@usda.gov
(tony.taylor@usda.gov, brian.beam@usda.gov)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
Amendment A0001 - This Amendment serves to answer currently submitted questions and correct files uploaded to SAM.gov. The file being corrected is attachment 2. ""Spearfish WC ROOF Replacement Specs."" This file is being removed and is replaced with the correct specifications of the same name with 4-23-24 included within that name. All quotes should be based off of the newly uploaded specs: 2. Spearfish WC Roof Replacement Specs 4-23-24 ----------------------------------------------------------------------------------------------------------------------- This Project is located at the Spearfish Work Center within Black Hills National Forest. The scope of work for this project includes removal of existing asphalt roofing system to the deck, inspection of the deck and replacement of deck material as needed, and installing a new asphalt roofing system on the Work Center Shop. Work also includes removal and replacement of Shop gutters and downspouts. The Contractor shall be responsible for field verifying all dimensions and quantities of materials required on this project. ALL construction activities shall be performed in accordance with all applicable OSHA standards or regulations. Some of the safety hazards that may be encountered while working on this site will be use of ladders, lifts, hoists, various hand tools, working on sloped surfaces, use of fall protection equipment, and use of applicable PPE. The Contractor will be required to cooperate with Government during construction operations to minimize conflicts and facilitate Government usage. Work shall be performed so as not to interfere with Government's day-to-day operations. Work shall be scheduled to minimize impacts to Government. All constructions operations shall be confined to immediate area of work. Contractor shall sweep and clean work areas and accessways daily to remove nails, screws, staples and other construction debris and minimize hazards to government employees, vehicles, and the public. Contractor shall not disturb portions of site that are not included in the described Work. Contractor shall provide schedules in electronic format and include a written summary narrative to explain basis of approach to work. Schedule contract work and monitor progress using a Critical Path Method (CPM) or similar type scheduling system. Prepare construction Schedule to complete the Work within the contract time requirement.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/8d612d3e9f914b09ae60d0a89191eb17/view)
 
Place of Performance
Address: Spearfish, SD 57783, USA
Zip Code: 57783
Country: USA
 
Record
SN07039745-F 20240425/240423230049 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.