Z -- Pre-solicitation: FY24 BRUNSWICK INNER HARBOR MAINTENANCE DREDGING

Notice Date
4/24/2024 10:20:34 AM
 
Notice Type
Presolicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
W074 ENDIST SAVANNAH SAVANNAH GA 31401-3604 USA
 
ZIP Code
31401-3604
 
Solicitation Number
W912HN24B5002
 
Response Due
4/17/2024 10:00:00 AM
 
Archive Date
05/02/2024
 
Point of Contact
Rohan Bryan, Phone: 9126525619, Glenda Canty, Phone: 9126525030
 
E-Mail Address
rohan.a.bryan@usace.army.mil, glenda.a.canty@usace.army.mil
(rohan.a.bryan@usace.army.mil, glenda.a.canty@usace.army.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
This synopsis is for the FY24 Brunswick Inner Harbor Maintenance Dredging. This acquisition is being offered as a 100% Small Business Set Aside and will result in a Firm Fixed Price Contract Award. The magnitude of this requirement per FAR 36.204 is between $1,000,000.00 and $5,000,000.00. Project Location:�The work is located in Brunswick Harbor Georgia deep draft navigation project.� Brunswick Harbor is located in Glynn County, Georgia, 70 statute miles south of the Savannah Harbor, Georgia, and 25 statute miles north of Fernandina Harbor, Florida.� Brunswick Harbor Inner Harbor channel is 36 ft. deep MLLW and 400 ft. wide through St. Simon Sound, Brunswick River, Turtle River, South Brunswick River, and East RiverThe work is located in Brunswick Harbor Georgia deep draft navigation project.� Brunswick Harbor is located in Glynn County, Georgia, 70 statute miles south of the Savannah Harbor, Georgia, and 25 statute miles north of Fernandina Harbor, Florida.� Brunswick Harbor Inner Harbor channel is 36 ft. deep MLLW and 400 ft. wide through St. Simon Sound, Brunswick River, Turtle River, South Brunswick River, and East River. Project Description:�Brunswick Harbor Inner Harbor is generally dredged in late summer or fall.� The dredging in the Brunswick Inner Harbor primarily takes place in the East River (stations 0+000 to 12+000) which includes the East River Turning Basin and the Transition Areas leading up to the turning basin and immediately upriver of the basin.� The South Brunswick River (stations 0+000 to 7+000) in the Brunswick Inner Harbor is the other area that generally requires dredging and is primarily dredged when shoaling become problematic to navigation but is constantly monitored monthly.� The Lower Turtle River (station 30+000 to 40+000) in the Brunswick Inner Harbor is another area that may require dredging and is primarily dredged when shoaling become problematic to navigation but is constantly monitored monthly.� Approximately 400,000 cubic yards of material is anticipated to be removed from the East River, approximately 75,000 cubic yards of material is anticipated to be removed from the South Brunswick River, and approximately 25,000 cubic yards of material is anticipated to be removed from the Lower Turtle River this dredging cycle. The maintenance material removed from the Brunswick Inner Harbor is placed in the Andrews Island Dredged Material Containment Area located adjacent to both the East River and the South Brunswick River.� Andrews Island is the only confined upland containment area in the Brunswick Inner Harbor. Advanced maintenance depths and locations for Brunswick Inner Harbor is as follows: East River, 0+000 to 2+500 project depth is 36� with 1� of advanced maintenance East River, 2+500 to 4+500 project depth is 36� with 5� of advanced maintenance East River, 4+500 to 6+250 project depth is 36� with 1� of advanced maintenance East River, Turning Basin project depth is 36� with 1� of advanced maintenance South Brunswick River, 0+000 to 7+000 project depth is 36� with no advanced maintenance Lower Turtle River, 30+000 to 40+000, project depth is 36� with no advanced maintenance Environmental windows limit the timing of dredging in the Brunswick Inner Harbors.� Environmental restrictions on the Brunswick Inner Harbor include a Least Tern nesting window to where dredged material must not be placed in the Andrews Island confined upland disposal area between the middle of April through the middle of August. Work Duration:�The estimated construction duration for the FY23 Brunswick Inner Harbor Maintenace Dredging is 120 days.� Evaluation Criteria: The contract will be solicited and procured using Sealed Bidding Procedures under FAR Part 14.� NOTE:�This solicitation will be issued in electronic format and is anticipated to be available on or about April 17, 2023.� Please note that only authorized transmission method for proposals in response to this solicitation is electronic via�Email, no other transmission methods (facsimile, regular mail, handcarried, etc) will be accepted. The Offerer's Bid must be received by the Government by the date/time specified in the solicitation. Offerers shall submit their proposal to Rohan Bryan at rohan.a.bryan@usace.army.mil, and Ms. Glenda Canty at� glenda.a.canty@usace.army.mil.� The bid opening date will be specified in the solicitation when issued. No additional media (CDROM, floppy disks, faxes, etc.) will be provided. Any prospective Offerer must register in the System for Award Management (SAM) at https:/ /www.sam.gov. After completing SAM registration, interested Contractors and their subcontractors must then follow the instructions listed in the solicitation documents to obtain access to the plans and specifications for this�solicitation. Contractors that have an existing account should be able to use their existing logins to search for the solicitation number once it is released at https://www.sam.gov. It is the Offerer's responsibility to check the Internet address provided in the solicitation as necessary for any amendments that may be posted to this solicitation. Paper copies of this solicitation will not be available. Other methods of requesting a package will not be honored. Contractual Questions should be forwarded to Contract Specialist, Rohan Bryan at rohan.a.bryan@usace.army.mil or to the attention of Contracting Officer, Glenda Canty at glenda.a.canty@usace.army.mil. The contracting office address is 100 West Oglethorpe Avenue, Savannah Georgia, 31401.�
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/90279c57b7204f4fb60dbf2a4add2b77/view)
 
Place of Performance
Address: Brunswick, GA, USA
Country: USA
 
Record
SN07041291-F 20240426/240424230048 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.