SOLICITATION NOTICE
Y -- Metal Shake Roof Replacement at Loyalhanna River Lake
- Notice Date
- 6/7/2024 10:44:46 AM
- Notice Type
- Combined Synopsis/Solicitation
- NAICS
- 238160
— Roofing Contractors
- Contracting Office
- W072 ENDIST PITTSBURGH PITTSBURGH PA 15222-4198 USA
- ZIP Code
- 15222-4198
- Solicitation Number
- W911WN24Q8004
- Response Due
- 6/28/2024 2:00:00 PM
- Archive Date
- 06/07/2025
- Point of Contact
- Aaron Barr, Phone: 412-395-7157, CONNIE FERGUSON, Phone: 4123957551
- E-Mail Address
-
aaron.m.barr@usace.army.mil, connie.l.ferguson@usace.army.mil
(aaron.m.barr@usace.army.mil, connie.l.ferguson@usace.army.mil)
- Small Business Set-Aside
- SBA Total Small Business Set-Aside (FAR 19.5)
- Awardee
- null
- Description
- USACE, Pittsburgh District, has a project to replace the metal shake roof at Loyalhanna River Lake. The contractor shall replace the shingle roof, gutters, and downspouts on the Resource Manager?s Office and adjacent Restroom at Loyalhanna River Lake in Saltsburg, Westmoreland County, PA. The Resource Manager?s Office is a wood-framed two-floor building with a singular gable originally constructed in1983. The roof consists of asphalt shingles over 1/2-in plywood sheathing. The restroom building is a wood framed single floor building with a singular gable originally constructed in 1983. The roof consists of asphalt shingles over 1/2-in plywood sheathing. Details of the resource manager?s office construction are shown in Attachment 2 ? Reference Drawings. Representative photos of the resource manager?s office and the restroom roof are shown in Attachment 3 ? Reference Photos. The work shall include removal and disposal of all roofing materials over the entire roof, including all flashing, pipe boots, drip edges, skylights, shingles, and roof felt, and replacement with new roofing underlayment, ice barrier, skylights, and shingles, new roof ridge vent, new pipe boots, and new flashing around all roof penetrations. Gutters and downspouts on all the eaves shall be removed and replaced with new aluminum seamless gutters and downspouts. All material provided in the performance of this contract shall be unused and meet the requirements of the specifications. If awarded, the restroom roof replacement requirements shall meet the same standards as the resource manager?s office.**NOTICE** Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Business-With-Us/Partnering/ then clicking on ?View FFP Contract Changes Playbook Here?.
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/e5ef8c6f427a41b4ba872c11b1be0385/view)
- Record
- SN07090231-F 20240609/240607230116 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |