Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JUNE 09, 2024 SAM #8230
SOLICITATION NOTICE

49 -- C-17 PSE - KIT, FIXTURE, HOLDING, LIFE RAFT

Notice Date
6/7/2024 9:08:07 AM
 
Notice Type
Solicitation
 
NAICS
334419 — Other Electronic Component Manufacturing
 
Contracting Office
FA8557 AFLCMC WLMKB ROBINS AFB GA 31098-2428 USA
 
ZIP Code
31098-2428
 
Solicitation Number
FA8526-24-Q-0027
 
Response Due
7/1/2024 2:00:00 PM
 
Archive Date
07/16/2024
 
Point of Contact
Davey Eades, Phone: 4789266969, Aliscia Pitts, Phone: 4784727041
 
E-Mail Address
davey.eades.1@us.af.mil, aliscia.pitts@us.af.mil
(davey.eades.1@us.af.mil, aliscia.pitts@us.af.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
*100% Small Business Set-Aside* The C-17 Program Management Office has a requirement that is for a firm-fixed price contract for one (1) each NSN: 4920-01-307-7269, FIXTURE, HOLDING, LIFE RAFT, P/N: 17G910004-1, which includes one (1) First Article, one (1) First Article Test Plan, and one (1) First Article Test Report. The C-17 aircraft contains 3 life raft assemblies and provisions for a fourth. Each life raft assembly (P/N 60485-101) is comprised of a 46-man life raft and emergency equipment kit all in an aluminum container. Each raft assembly measures approximately 36 inches X 18 inches X 18 inches and weighs approximately 200 pounds. The assemblies are stowed inside the fuselage above the cargo floor, two forward and two Aft. The assemblies are preloaded against the longerons and fuselage skin to 1000 pounds by the deployment cable. For scheduled organizational and depot levels of maintenance, it will be necessary to periodically remove the life raft assemblies for scheduled inspections on a six-month interval. Each life raft assembly is secured to the aircraft by two brackets and a deployment cable. One end of the container has an attached channel section approximately 3/4 inch across. The deployment cable is fastened to the channel with a �D� ring. The other end of the container has two attached channel sections. The top of the channel sections are attached to the mounting brackets with two small pins. Removal/Installation of the life raft assembly requires releasing the preload tension and detaching the deployment cable, and unfastening the brackets. A means is required to support the assemblies during removal and installation due to the weight and locations of the life raft assemblies. The means must be able to securely suspend and provide control of the assemblies from the airframes within the limited space between the fuel lines and environmental ducts. The newly developed contractor furnished Life Raft Holding Fixture (P/N:17G910004-l) is recommended to fulfill the requirements. Delivery is FOB Destination with shipments in the continental United States. This requirement will be solicited as a Competitive 100% Small Business Set-Aside. All responsible sources may submit a quotation which shall be considered by the agency. The Government will utilize the Past Performance Information Retrieval System (PPIRS), Excluded Parties List System (EPLS), and other Government databases to determine contractor status before evaluating proposals. Proposals will be evaluated based on the criteria stated in the RFQ. All data for this weapon system is considered EXPORT CONTROLLED. Proposal responses due 1 July 2024 5:00 p.m. EST.�
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/e107872ea2284a7885de6870731bf622/view)
 
Place of Performance
Address: Warner Robins, GA 31098, USA
Zip Code: 31098
Country: USA
 
Record
SN07090447-F 20240609/240607230117 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.