Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF AUGUST 07, 2024 SAM #8289
SOLICITATION NOTICE

Y -- TX FW TECH MULTI (1), Various Routes & Parking

Notice Date
8/5/2024 10:13:01 AM
 
Notice Type
Presolicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
6982AF CENTRAL FEDERAL LANDS DIVISI LAKEWOOD CO 80228 USA
 
ZIP Code
80228
 
Solicitation Number
6982AF24B000012
 
Response Due
8/20/2024 3:00:00 PM
 
Archive Date
09/04/2024
 
Point of Contact
Doug Whitcomb, Ryan Phillips
 
E-Mail Address
cflacquisitions@dot.gov, cflacquisitions@dot.gov
(cflacquisitions@dot.gov, cflacquisitions@dot.gov)
 
Description
THIS IS NOT AN INVITATION FOR BID, PLANS AND SPECIFICATIONS ARE NOT AVAILABLE THIS WILL BE ADVERTISED AS FULL AND OPEN COMPETITION.� PROJECT NUMBER:� �TX FW TECH MULTI (1) PROJECT NAME: ��Various Routes & Parking Project Location The project is in the Texas Chenier Plain Wildlife Refuge Complex, which includes a string of coastal refuges that harbor much of the coastal migratory bird habitat along the upper Texas coast. Anahuac National Wildlife Refuge and McFaddin National Wildlife Refuge are managed as part of the Complex.� In 2017, the Complex suffered damages as a result of Hurricane Harvey requiring repairs to roadways, parking areas, and associated transportation infrastructure.� The proposed improvements will be contained within the Texas Chenier Plain Wildlife Refuge Complex boundaries. The action area consists of approximately 16.4 miles of existing roadways and the improvements are listed below by project scheduling.� SCOPE OF THE WORK:� � The project includes reconstruction of a portion of the existing asphalt, chip seal maintenance to reseal and prolong the pavement life within the existing roadway boundaries, improve surface drainage and remove an existing low spot that does not drain properly.� Work will be contained to the existing parking lot footprint with no additional widening. Schedule A includes: The work will include approximately 14.7 miles (of chip seal maintenance to reseal and prolong the pavement life within the existing roadway boundaries). This work will occur along the Anahuac NWR entrance road, Windmill Road, Shoveler�s Pond Road, Boat Ramp Road (Oyster Bayou), and Skillern Tract Road within Anahuac NWR and along Clam Lake Road within McFaddin NWR. Option X includes: Asphalt paving of existing aggregate roadway with asphalt in two locations: approximately 1.7 mi of Windmill Road and approximately 200 ft of parking space at Crabber�s Corner. The asphalt pavement section along Windmill Road will be 4 inch of asphalt pavement over 4 in of aggregate base on the existing gravel roadway width. PRINCIPAL WORK ITEMS: Schedule A 15 Miles Centerline, Verification and Staking 250 Cuyd of Roadway Excavation 1,200 Cuyd of Subexcavation � 250 Ton of Asphalt Concrete Pavement Type 1 156,000 SQYD of Chip Seal, Type B 300 Ton of Emulsified Asphalt 8,500 SQYD of Micro Surface, Type 1 1 LPSM Temporary Traffic Control Option X 1 LPSM Soil Erosion Control � 2,500 Cuyd of Roadway Excavation 4,800 TON of Roadway Aggregate, Method 2 4,300 TON of Asphalt Concrete Pavement, Type 1 17,600 SQYD Roadbed Reconditioning DISCLOSURE OF MAGNITUDE:� The estimated price range is between $5,000,000 and $10,000,000.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/e3f2f214b30049529b82632fd00381d5/view)
 
Place of Performance
Address: Wallisville, TX 77597, USA
Zip Code: 77597
Country: USA
 
Record
SN07156387-F 20240807/240805230116 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.