Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF AUGUST 16, 2024 SAM #8298
AWARD

Y -- Craney Island Earthwork IDIQ FY24

Notice Date
8/14/2024 9:34:11 AM
 
Notice Type
Award Notice
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
W2SD ENDIST NORFOLK NORFOLK VA 23510-1096 USA
 
ZIP Code
23510-1096
 
Solicitation Number
W9123624D5001
 
Archive Date
08/28/2024
 
Point of Contact
AMY COODY, Phone: 757.201.7883, NICHOLAS LIZOTTE, Phone: 7572017310
 
E-Mail Address
amy.h.coody@usace.army.mil, Nicholas.Lizotte@usace.army.mil
(amy.h.coody@usace.army.mil, Nicholas.Lizotte@usace.army.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Award Number
W9123624D5001
 
Award Date
08/13/2024
 
Awardee
Three Oaks Construction, Inc North Sioux City SD 57049 USA
 
Award Amount
75000000.00
 
Description
CIDMMA is a confined upland dredge material placement site located in Portsmouth, Virginia, adjacent to the Port of Hampton Roads. Work activities will include borrow area preparation for the purpose of dewatering saturated materials for future use, excavation, and reclamation of dredged material from prepared borrow areas, transport of reclaimed and borrowed materials, and construction of site improvement infrastructure projects with the material. The infrastructure projects on CIDMMA that may be built include, but are not limited to: 1. Construction and maintenance of containment dikes and division dikes to a compaction performance standard with incremental vertical lifts of material. 2. Construction of access roads within containment cells at CIDMMA. 3. Placement of reclaimed material as overburden for the purpose of consolidation of saturated materials. 4. Placement of reclaimed material as stockpile. 5. Excavation of saturated dredged material from around and within existing spillways for the purpose of maintenance of spillway components and structures. 6. Excavation and maintenance spillway effluent discharge pipes, outfalls, and aprons. 7. Steel and Concrete repair at the spillbox structures 8. Replacement of weir boards and repositioning of the gangways at the spillbox structures Contractor shall be responsible for before and after topographic surveys of the dike raising areas. All reclaimed material for the earthwork site improvements will be government supplied from on-site borrow sources. Total material volume placed is not expected to exceed 1,000,000 cubic yards per contract year. Construction techniques and equipment must accommodate soft and wet subsurface and fill soil conditions with high susceptibility to rapid and long-term settlements under instantaneous and sustained loading conditions. Contract No. W9123624D5001, Craney Island Earthwork IDIQ, Portsmouth, VA is awarded for a total Not-To-Exceed $75,000,000.00. This award is based on the bid dated 03 June 2024 with acknowledgement of all amendments (0001 through 0003) and constitutes acceptance of your bid (including the construction cost schedule, CLINs 0001�0014) with a total evaluated price of $52,820,155.00. Task Order No. W9123624F0013 is being issued concurrently for the amount $12,016,191.10, satisfying the minimum guarantee for the IDIQ contract.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/b58aec12c0ab4291b62b2d6d498c15c3/view)
 
Place of Performance
Address: Portsmouth, VA, USA
Country: USA
 
Record
SN07169250-F 20240816/240814230107 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.