Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF AUGUST 16, 2024 SAM #8298
SOLICITATION NOTICE

Z -- Expand Existing Restrooms

Notice Date
8/14/2024 10:34:44 AM
 
Notice Type
Solicitation
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
FA9401 377 MSG PK KIRTLAND AFB NM 87117-0001 USA
 
ZIP Code
87117-0001
 
Solicitation Number
FA940124B0005
 
Response Due
8/19/2024 3:30:00 PM
 
Archive Date
08/14/2025
 
Point of Contact
JEFFREY Sorensen, Phone: 5058466198, Dakota Powell, Phone: 505-846-4669
 
E-Mail Address
jeffrey.sorensen.8@us.af.mil, dakota.powell@us.af.mil
(jeffrey.sorensen.8@us.af.mil, dakota.powell@us.af.mil)
 
Small Business Set-Aside
HZC Historically Underutilized Business (HUBZone) Set-Aside (FAR 19.13)
 
Awardee
null
 
Description
The first of three amendments (Amendment 1) was released on 05 August 2024. The purpose of Amendment 1 is to incorporate offeror consolidate question(s) and Government answer(s) (Attachment 20. QA), and add information for a second site visit in Section L, paragraph 2.1.The second of two amendments (Amendment 2) was released 12 August 2024. The purpose of Amendment 2 is to update the bid opening location to the CEI Conference Room at 377 MSG/CE, 2050 Wyoming Blvd SE, Building 20685, Kirtland AFB, NM 87117. The third of three amendments (Amendment 3) was released 14 August 2024. The purpose of Amendment 3 is to extend the bid due date, bid opening date, and update the bid opening location. Please see Section L of the SF30 for further details. Please ensure bids acknowledge all three (3) amendments on the SF1442 box 19. The purpose of this Design Build effort is to renovate the existing mens and womens restrooms at Kirtland Air Force Base Bldg. 20204. The renovation shall expand restroom capacity, enhancing the facilities, and improve the overall functionality of the existing restrooms. Design includes, but is not limited to providing the services of all the licensed design professionals in the disciplines required to produce the drawings, specifications, design analysis, estimate and schedule which shall describe the project in strict accordance with the requirements outlined in Section 3 of the Statement of Work. Construction includes, but is not limited to, the following conducting field verification, provide all licenses, permits, labor, tools, equipment, means and methods required to design and construct the project in strict accordance with the requirements outlined in the Statement of Work.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/c3df9be8877247e0a89261a8ea5ebf23/view)
 
Record
SN07169981-F 20240816/240814230114 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.