Z -- The Dalles Campground Improvements

Notice Date
9/5/2024 2:14:46 PM
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
USDA FOREST SERVICE-SPOC NW Washington DC 202500001 USA
 
ZIP Code
202500001
 
Solicitation Number
12048924R0016
 
Response Due
9/12/2024 10:00:00 AM
 
Archive Date
09/27/2024
 
Point of Contact
Kevin Flores, Phone: 9714302344, Jason Tanamor
 
E-Mail Address
Kevin.Flores@usda.gov, Jason.Tanamor@usda.gov
(Kevin.Flores@usda.gov, Jason.Tanamor@usda.gov)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
The intent of this project is to restore the degraded asphalt surfacing on all roads and select camping sites in the Dalles Campground to provide for access, upkeep and safety as well as install 8 closure devices, single and double arm steel gates and rock barriers in the Mt. Baker-Snoqualmie National Forest. The scope of work includes asphalt laying, sign installations, parking backstop installation, removing trees in various stages and log rail installation including the following: asphalt compaction, base rock laying and compaction, tree cutting and removal, pick up and deliver prepared gates to forest roads, gate installation, place signs on gates, painting gates and calibrate them to open and close smoothly including all associated mobilization. All questions are due no later than 1000 on 06 Sep 2024. SUBMITTED QUESTION ATTACHED ON 04 SEP 2024 � VENDOR QUESTION Attachment 3 Paving Map appears to include drawings of an additional camp area, not the Dalles campground. Was this campground to be included as part of our pricing?�� The pricing schedule doesn�t appear to include these quantities. GOVERNMENT ANSWER That additional campground has some signage needs only.� A separate summary for each campground was not included but rather just totaled all of the signs for both projects.� These campgrounds are only a few miles apart so there is not a huge mobilization cost. VENDOR QUESTION The performance period states from 10/1/2024 to 11/1/2025 but contract period is 120 days What duration is correct? Can some work be accomplished in fall of 2024 or all work starting in June through October What restriction do we have from starting work in the campground outside of the stated work window. GOVERNMENT ANSWER We can make the performance period 10/1/2024 to 11/1/2025 so that they will have time next year to perform work in suitable weather.� All work could be performed this Fall if weather is favorable.� Some work can begin today, such as putting up signs, since it would not displace any pre-registered guests that would be bumped if major construction were to start outside of this window.� All campgrounds typically close a few weeks after Labor Day but if weather is great, they can opt to stay open a little longer.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/4f7086f816884e3584b3e87a3fe1438a/view)
 
Place of Performance
Address: Enumclaw, WA 98022, USA
Zip Code: 98022
Country: USA
 
Record
SN07199581-F 20240907/240905230121 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.