Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF SEPTEMBER 11, 2024 SAM #8324
SOLICITATION NOTICE

Y -- Lock 4 Allegheny River Lockmasters Office Roof Replacement

Notice Date
9/9/2024 10:21:32 AM
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
238160 — Roofing Contractors
 
Contracting Office
W072 ENDIST PITTSBURGH PITTSBURGH PA 15222-4198 USA
 
ZIP Code
15222-4198
 
Solicitation Number
W911WN24Q8005
 
Response Due
10/9/2024 2:00:00 PM
 
Archive Date
09/09/2025
 
Point of Contact
Mario Dizdarevic, Phone: 5023157421, CONNIE FERGUSON, Phone: 4123957551
 
E-Mail Address
mario.dizdarevic@usace.army.mil, connie.l.ferguson@usace.army.mil
(mario.dizdarevic@usace.army.mil, connie.l.ferguson@usace.army.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Awardee
null
 
Description
Lockmasters Office Roof at Lock 4, Allegheny River, Natrona, PA for the U.S. Army Corps of Engineers, Pittsburgh District. In general, the tasks required in the performance of this contract include: The contractor shall replace the shingle roof, gutters, and downspouts on the Lockmasters Office. Details of the building construction are shown on the attached reference drawings Attachment 2 ? Reference Drawings and Photos. Representative photos of the roof and details of the required work are included as well. The work shall include removal and disposal of all roofing materials over the entire roof, front and back porch roof, including inspection of wood decking for rot, including all flashing, drip edges, shingles and roof felt, and replacement with new roofing underlayment, ice barrier and shingles, new roof ridge vent, new rubber roof boots, soffit, facia, and new flashing around all roof penetrations. Gutters and downspouts on all the eaves including porch roofs shall be removed and replaced with new aluminum seamless gutters and downspouts. The Chimneys will need repointed above the roof line and the chimneys roof step flashing replaced. All material provided in the performance of this contract shall be new and meet the requirements of the specifications. **NOTICE** Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Business-With-Us/Partnering/ then clicking on View FFP Contract Changes Playbook Here.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/3c98326d30a541e6b91554fb987e65c8/view)
 
Record
SN07203496-F 20240911/240909230115 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.