Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF OCTOBER 12, 2024 SAM #8355
AWARD

36 -- 763-24-2-228-0142 -763CMOP A-Frame Upgrade Package 763E40010

Notice Date
10/10/2024 7:24:25 AM
 
Notice Type
Award Notice
 
NAICS
333922 — Conveyor and Conveying Equipment Manufacturing
 
Contracting Office
NATIONAL CMOP OFFICE (36C770) LEAVENWORTH KS 66048 USA
 
ZIP Code
66048
 
Solicitation Number
36C77024Q0215
 
Archive Date
11/24/2024
 
Point of Contact
Larry Zaritz, Contracting Officer, Phone: 913-684-0156
 
E-Mail Address
larry.zaritz@va.gov
(larry.zaritz@va.gov)
 
Award Number
36C77024P0316
 
Award Date
09/30/2024
 
Awardee
KNAPP INC KENNESAW 30144
 
Award Amount
1177008.00
 
Description
2 PERFORMANCE WORK STATEMENT (PWS) Lancaster CMOP KNAPP Upgrade and System Integration BACKGROUND & INTRODUCTION The Dallas CMOP located in Lancaster Texas, is one of seven Consolidated Mail Outpatient Pharmacy (CMOP) facilities located across the United States. This Department of Veterans Affairs (VA) program provides prescription fulfillment and mailing for Veteran patients. Advanced automation and equipment schemes are used in this highly automated environment to fulfill prescription orders from Department of Veterans Affairs Medical Centers (VAMC) and Community Based Outpatient Clinics (CBOC) throughout the country, with the potential for future growth based upon agreements with other Federal agencies. SCOPE OF WORK Update/upgrade the existing A-frame Auto Picker equipment manufactured and installed by KNAPP, Inc., which is located at the Lancaster CMOP in Lancaster Tx. It will be necessary to update all ejectors from the SDA2000 to the SDA2007, BBU aka, High Speed Transfer Station (this is a complete replacement package including new motor and motor VFD drive), update the existing SDA control software with the newest version of ACS, Exchange/replacement of central belt including all bearings, rollers, drive motor, motor VFD to include feedback equipment such as tacks, encoders or resolvers, and install stackable light indicators with an audible alarm on each module to indicate errors or empty channels. HMI for Operators located at the High-speed Induction area will also be replaced. Contractor shall document all work done and any additional concerns. The upgrade must be completed without shut down of the entire KNAPP system.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/78be8c402c224c7d98f12381c3c01223/view)
 
Record
SN07237733-F 20241012/241010230056 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.