Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF OCTOBER 26, 2024 SAM #8369
SOLICITATION NOTICE

Z -- Williams Creek Surfacing Site Visit

Notice Date
10/24/2024 12:06:59 PM
 
Notice Type
Presolicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Salmon and Challis National Forests SALMON ID 83467 USA
 
ZIP Code
83467
 
Solicitation Number
1240LT25R0003
 
Response Due
11/6/2024 9:00:00 AM
 
Archive Date
11/21/2024
 
Point of Contact
Juan Ortiz
 
E-Mail Address
juan.ortiz1@usda.gov
(juan.ortiz1@usda.gov)
 
Description
This project will involve pit development of a government source, mining materials, crushing pit material into a blended surface course aggregate with commercial source additives. Items to complete: Perform roadway reconditioning along project length (7 miles of reconditioning from MP 21 to MP 28 of FSR 101). Crush, mix, haul, and place surface course aggregate along project length (7 miles of surfacing from MP 21 to MP 28 of FSR 101). Crush and Stockpile Aggregate includes development and use of pits, either government source or commercial source, to the specified gradation, including adding approximately 2% bentonite by weight to achieve desired properties. Actual % will be based on contractor�s initial materials testing. This includes clearing and grubbing, removing overburden, mining, crushing, mixing aggregate with bentonite using a pugmill, weighing, creating stockpiles (including any loading or hauling to create stockpiles), testing, and final site reclamation including placing overburden, waste materials, mulching, and seeding. Perform the work in accordance with MSHA 30 CFR, part 56. Surfacing - Aggregate Surface Course includes necessary surface preparations before placing aggregate such as: material and quality control testing, surface preparation (reconditioning), clearing and grubbing, spreading, watering, compacting, temporary traffic control, erosion control measures, and all other incidental work to surface the road (see surfacing typical on sheet G-05). Surface to the compacted depth specified in the drawings for the full roadway width, including all existing turnouts and widenings. Intersecting roads shall be bladed, shaped and surfaced for a smooth transition. Spread control and staking for aggregate is the responsibility of the contractor. Protect the environment and resources impacted by all construction activity according to all legal requirements, regulations, specifications, and best management practices (BMPs). East Leesburg Pit: Develop pit for operations, including clearing and grubbing, all incidental to crush and stockpile aggregate payment. Mine, crush, and blend aggregate with approved additives, stockpile material in the pit for surfacing.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/ea83ccc2d5584e4ab19d892f4b38d73b/view)
 
Place of Performance
Address: ID, USA
Country: USA
 
Record
SN07248310-F 20241026/241024230109 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.