SOURCES SOUGHT

Y -- CLARENCE CANNON NATIONAL WILDLIFE REFUGE HABITAT REHABILITATION AND ENHANCEMENT PROJECT STAGE 5 GRAVITY DRAIN DEBRIS BARRIER SYSTEM

Notice Date
11/13/2024 7:25:55 AM
 
Notice Type
Sources Sought
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
W07V ENDIST ST LOUIS SAINT LOUIS MO 63103-2833 USA
 
ZIP Code
63103-2833
 
Solicitation Number
W912P925R0004
 
Response Due
12/4/2024 8:00:00 AM
 
Archive Date
12/04/2025
 
Point of Contact
Angie Grimes, Phone: 3143318965, MIchelle Person, Phone: 314-331-8506
 
E-Mail Address
angie.l.grimes@usace.army.mil, michelle.r.person@usace.army.mil
(angie.l.grimes@usace.army.mil, michelle.r.person@usace.army.mil)
 
Awardee
null
 
Description
USACE St. Louis District is seeking businesses that can provide a debris barrier system at Clarence Cannon National Wildlife Refuge (CCNWR) gravity drain in Annada, Missouri. The gravity drain is along the southern exterior berm of the refuge along Bryant?s Creek. The gravity drain is a concrete structure with a 16 ft wide and 18 ft tall opening. The structure allows water to flow in and out of the refuge by operating an overshot gate. A bridge deck lays over the gravity drain to allow vehicular access along the berm. The bridge was designed to resist AASHTO HL-93 tandem and lane loads.The project consists of designing and installing a debris barrier system to the existing gravity drain structure that can be raised when operating the gate. The barrier must be removed during the event of water overtopping. The barrier must prevent woody debris from entering the gravity drain. The woody debris ranges from 1 in. to 6 in. in diameter. A maximum of two workers is desirable to operate and maintain the system. There are no power sources onsite and no permanent power sources are anticipated. The gravity drain holds approximately 4 feet of water when the gate is closed.The proposed design must follow USACE guidance and standards.The following figure shows the overshot gate at the gravity drain. The photo was taken from the refuge side during construction.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/00ea98af290b40a6a9530f3e51a102cc/view)
 
Record
SN07264143-F 20241115/241113230112 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.