99 -- Uninterrupted Power Supply (UPS) for the National Guard Bureau�s (NGB) Analytical Laboratory Suite Modified Work Order (ALS-MWO)

Notice Date
11/13/2024 7:56:15 AM
 
Notice Type
Sources Sought
 
NAICS
334111 — Electronic Computer Manufacturing
 
Contracting Office
W6QK ACC-APG ABERDEEN PROVING GROU MD 21010-5424 USA
 
ZIP Code
21010-5424
 
Solicitation Number
RFI-UPS-ALS-MWO
 
Response Due
11/20/2024 2:00:00 PM
 
Archive Date
12/05/2024
 
Point of Contact
Tyler N. Gates, Phone: 5206711119, Nathaniel W. Sievers, Phone: 5206929630
 
E-Mail Address
tyler.n.gates2.civ@army.mil, nathaniel.w.sievers.civ@army.mil
(tyler.n.gates2.civ@army.mil, nathaniel.w.sievers.civ@army.mil)
 
Description
REQUEST FOR INFORMATION (RFI) THIS IS A REQUEST FOR INFORMATION (RFI) ONLY � This RFI is issued solely for market research, information, and planning purposes � it does not constitute a Request for Proposal (RFP)/Request for Quote (RFQ) or a promise to issue an RFP/RFQ in the future. Solicitations are not available at this time. Requests for a solicitation will not receive a response. This notice does not constitute a commitment by the United States Government to contract for any supply or service whatsoever. All information submitted in response to this announcement is voluntary; the United States Government will not pay for information requested nor will it compensate any respondent for any cost incurred in developing information provided to the United States Government. Not responding to this RFI does not preclude participation in any future RFP/RFQ, if any is issued. The US Army Contracting Command � Aberdeen Proving Ground (ACC-APG) Edgewood Contracting Division (ECD) is exploring options for a replacement Uninterrupted Power Supply (UPS) for the National Guard Bureau�s (NGB) Analytical Laboratory Suite Modified Work Order (ALS-MWO). Technical requirements for the UPS are listed in the below table for reference. The purpose of the UPS is to provide clean uninterrupted power for dedicated laboratory equipment inside the mobile lab in case of loss of shore or generator power. The UPS must be available to purchase by NGB to replace legacy units and future failures. ACC-APG ECD is seeking the following information: Please provide information on the availability of a UPS that meets the following technical requirements as outlined in the below table: Characteristic/Requirement: Run Time 40 minutes @ 10kW Configuration Single/Split Phase Rackable mount on Standard 19U rack Input Power 208V � 240V Output Power 120V Bypass Mode Manual option (Input = output when activated to allow unit to bypass batteries in an emergency) Height Requirement Max Height 17.25� (Total to include all additional stacked batteries needed to meet power and run time requirements) Width Requirement Rackable in Standard 19� wide Rack Depth Requirement 26.875� Power Output Power must be conditioned with true sine wave output Minimum 10kW (10kVA) UPS power Capacity TAA Compliance Trade Agreement Act (TAA) Compliance Please confirm the commercial availability of any UPS that your firm is able to provide which meets the above technical and dimension/stacking requirements. For each UPS that can meet the requirements, please provide the following information: Manufacturer Model Number Any technical brochure/information on the unit Availability/Typical lead time from order to delivery Rough order of Magnitude (ROM) pricing per unit (including estimated shipping costs within the continental US) assuming minimum of 10 units. Respondents shall not be obligated to provide any supplies/services described herein, and it is understood by the United States Government that any cost estimates provided as a result of this request are Rough order of Magnitude (ROM) estimates for market research purposes only and do not constitute a formal proposal/quote. The response deadline for this market research is no later than 5pm ET Wednesday, November 20th, 2024. All responses to this RFI shall be submitted via e-mail to Tyler Gates, Contracting Officer, at tyler.n.gates2.civ@army.mil and to Nathaniel Sievers, Contract Specialist, at Nathaniel.w.sievers.civ@army.mil. **Please ensure the entirety of your email response to this RFI (to include any email attachments) do not exceed 15MB in total. Failure to adhere to this file size limitation may result in the response (or portions of the response) not being received by the Government.**
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/dd40d126e7e9469dbfc4a6780e6fc7e9/view)
 
Place of Performance
Address: Aberdeen Proving Ground, MD, USA
Country: USA
 
Record
SN07264244-F 20241115/241113230113 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.