Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF NOVEMBER 24, 2024 SAM #8398
SOURCES SOUGHT

16 -- Procurement Opportunity Document (POD) for Medium Explorer Concept Spacecraft and On-Orbit Support

Notice Date
11/22/2024 9:39:11 AM
 
Notice Type
Sources Sought
 
NAICS
336419 — Other Guided Missile and Space Vehicle Parts and Auxiliary Equipment Manufacturing
 
Contracting Office
NASA GODDARD SPACE FLIGHT CENTER GREENBELT MD 20771 USA
 
ZIP Code
20771
 
Solicitation Number
2024_Helio_MIDEX_Concept_1_POD
 
Response Due
1/6/2025 1:00:00 PM
 
Archive Date
01/21/2025
 
Point of Contact
Barbie Medina, Kelly Collins
 
E-Mail Address
Barbie.Medina@nasa.gov, kelly.collins@nasa.gov
(Barbie.Medina@nasa.gov, kelly.collins@nasa.gov)
 
Description
The partnership opportunity is being issued to select teaming partners to serve as the satellite (spacecraft) integrator for this MIDEX mission, which includes providing a spacecraft bus consistent with a Class C mission per NPR 8705.4 Risk Classification for NASA Payloads, instrument to spacecraft integration and environmental testing support (at the vendors facility), integration support for the observatory to launch vehicle, and support for mission operations. Also, as an option, the selected partner to provide a mission operations center. NOTE: Upon selection, GSFC may discuss, and further tailor the roles proposed by respondents in the best interests of the proposal. The proposed mission is currently in pre-Phase A. If the proposal is down selected, the next step in the proposal process is a mission concept study culminating in a Concept Study Report (CSR), followed by a Site Visit. The following schedule should be used as a basis for responses to this opportunity: Helio MIDEX Draft AO Released: April 2025 (target) Helio MIDEX AO Released: July 2025 (target) Pre-proposal conference: ~3 weeks after final AO release Step-1 proposal due: 90 days after AO release Selection for competitive Phase A studies: April 2026 (target) Concept Study Reports (CSRs) due: 9 months after selection Step-2 down select: July 2027 (target) AO required Launch Readiness Date: January 2032 (TBR)
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/9bb01ac286574bf2985d21a800c1834a/view)
 
Record
SN07273811-F 20241124/241122230115 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.