Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF DECEMBER 07, 2024 SAM #8411
SOURCES SOUGHT

99 -- Cable Carrier Replacement

Notice Date
12/5/2024 7:13:57 AM
 
Notice Type
Sources Sought
 
Contracting Office
FA8571 MAINT CONTRACTING AFSC PZIM ROBINS AFB GA 31098-1672 USA
 
ZIP Code
31098-1672
 
Solicitation Number
76157
 
Response Due
1/7/2025 11:00:00 AM
 
Archive Date
01/22/2025
 
Point of Contact
Nicole Mitchell, Phone: 4789260617, Claudette Macneil
 
E-Mail Address
brandi.mitchell@us.af.mil, claudette.macneil@us.af.mil
(brandi.mitchell@us.af.mil, claudette.macneil@us.af.mil)
 
Description
The Government is conducting market research to identify potential sources that may possess the expertise, capabilities, and experience to provide all materials, tools, and equipment needed for the removal, disposal and installation services of the plating line cable carrier system replacement. The old plastic Energy Chain (E-Chain) cable carrier system shall be replaced with the new E-Chain and 316 stainless steel trough for a total of up to eight (8) plating lines located in building 20128, for the 402nd Commodities Maintenance Group (CMXG), Robins Air Force Base, Georgia. Each plating line has two (2) overhead hoists in which each hoist has a cable carrier. This is a build to print acquisition with service (installation) incidentals. This requirement is for a one (1) year basic contract plus three (3) one (1) year exercisable option periods. The estimated quantities will be for a total of up to eight (8) plating lines, two (2) each year until all eight (8) are complete. This requirement will replace the cable carrier for each hoist along each of the plating lines. The cable carrier is an essential piece of the hoist operation to prevent damage to cables and provide a smooth transition of the hoist up and down the plating line. The plating line cable carrier provides coatings that protect aircraft from corrosion and premature failure. Currently, the cable carrier is made of thin plastic material not specifically designed for the corrosive environment in which it is exposed. The new cable carrier system shall have a more robust, durable, thicker material that can handle the day-to-day exposure to the corrosive environment along with normal usage on each plating line. The requirement will include all new cables, 316 stainless steel track in which the carrier will sit in, cable separators within the carrier, tow arm that hooks to the hoist strain relief clamps and installation. This requirement shall be IAW attached PWS, Line 1 Hoist 1 Drawing, Line 1 Hoist 2 Drawing, Lines 2-4 Hoist 1 Drawing, and Hoist Structure Layout Drawing for this requirement.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/d89b82187a5745c3b3771193a05bb0fd/view)
 
Place of Performance
Address: Warner Robins, GA 31098, USA
Zip Code: 31098
Country: USA
 
Record
SN07284010-F 20241207/241205230124 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.